Booting the Switch
ARX-500 Hardware Installation Guide
3 - 15
To access the client/server network, enable at least one client/server VLAN
with at least one member interface and a management IP, and establish a
default route on that VLAN’s IP network. The following example reaches a
client/server network on VLAN 74:
SWITCH>
enable
SWITCH#
config
SWITCH(cfg)#
vlan
74
SWITCH(cfg
‐
vlan[74])#
members
1/5
SWITCH(cfg
‐
vlan[74])#
exit
SWITCH(cfg)#
interface
vlan
74
SWITCH(cfg
‐
if
‐
vlan[74])#
ip
address
192.168.74.66
255.255.255.0
SWITCH(cfg
‐
if
‐
vlan[74])#
no
shutdown
SWITCH(cfg
‐
if
‐
vlan[74])#
exit
SWITCH(cfg)#
interface
gigabit
1/5
SWITCH(cfg
‐
if
‐
gig[1/5])#
no
shutdown
SWITCH(cfg
‐
if
‐
gig[1/5])#
exit
SWITCH(cfg)#
ip
route
0.0.0.0
0.0.0.0
192.168.74.1
SWITCH(cfg)#
exit
SWITCH#
If your network has more complex requirements, refer to
Configuring Layer
2
and
Configuring the Network Layer
in the
ARX® CLI
Network-Management Guide
for a complete set of options and instructions.
Upgrading the Software and Firmware on the Replacement ARX
If the replacement ARX is running an outdated release, you must upgrade its
software and firmware. Use the stand-alone instructions in
Upgrading
Software, on page 6-1
of the
ARX CLI Maintenance Guide
. If the software is
more than two major releases behind the target release (that is, release 3.x.y
or earlier), upgrade fully to a 4.x or 5.x release and then upgrade to the
target release.
The following command sequence upgrades both the software and the
firmware on the new
provA
switch from 5.1.0 to 6.2.0:
SWITCH#
copy
ftp://jusr:[email protected]/12345.rel
releases
test5.rel
%
INFO:
Copying
1013
megabytes
from
the
specified
source
.
.
.
...
%
INFO:
The
copy
completed
successfully.
SWITCH#
show
releases
releases
R
A
test1.rel
Dec
8
00:14
800
MB
B
test2.rel
Dec
7
00:06
800
MB
test5.rel
Sep
10
00:09
1.0
GB
Arm the system with the new release and then reload the ARX to activate
the release.
Содержание ARX-500
Страница 1: ...ARX 500 Hardware Installation Guide 810 0039 00 ...
Страница 2: ......
Страница 7: ...Table of Contents ...
Страница 8: ......
Страница 10: ...Table of Contents x ...
Страница 11: ......
Страница 12: ...Table of Contents xii ...
Страница 14: ......
Страница 22: ......
Страница 32: ......
Страница 50: ...Chapter 3 Connecting the Switch to the Network 3 20 ...
Страница 51: ...4 Maintenance Powering Down the ARX 500 POST Diagnostics Front Panel LEDs Rear Panel LEDs ...
Страница 52: ......
Страница 59: ...Index ...
Страница 60: ......
Страница 62: ...Index Index 4 ...