Publication: UTV SKID SPRAYER 2017-01
1. Remove the 4 bolts and 2 unpainted
shipping braces on the control arm.
The two 6” shipping braces may
be discarded and there will be one
extra set of nuts and bolts. Rotate
arm to line up with three holes on
the corner bracket then reinstall
bolts and tighten.
See Image #2.
2. Install the pressure gauge in the port
next to the manual control valve,
located on the control arm.
See
Image #3.
3.
Slide sprayer inside the machine and
secure down.
Image 2
All Standard Sprayers Should Contain:
Image 3
Setup Instructions:
Pressure Knob
Pressure Gauge
Control Lever
(2) Spray Outlets
Drain Valve & Cap
Agitation Valve
Boom Arm
Pump Valve
Pump (Gas or Electric)
Hose Reel (w/30 ft. of 3/8” Hose)
Image 1
Pressure Return Inlet
Filter
Agitation Inlet
Spray Wand
Boom Height
Brackets
Tank
Tank Lid
Frame
Control Arm