
Mounting the projection unit
NOTICE
Handling of the screens
If the screen is handled incorrectly, the screen may be scratched or the
housing damaged.
►
Wear (cotton) gloves when installing the screen.
►
Remove the cardboard protections from the screen before mounting it on
the cube housing.
►
Lift up the screen carefully and avoid touching the screen surface.
►
Do not hold the screen in the middle of the basement since the screen
may break or fall out.
Earthing the cube wall
The cube housings have to be daisy chained with the earthing cables provided
to guarantee the electrical safety of the cube wall. The earthing cables are
pre-installed at the bottom left and right in each housing.
To connect the earthing cables:
1.
Guide the earthing cables through the circular openings and screw the
cable eyelets with the prepared screw to the next housing.
2.
Connect all the cube housings together in the same way.
3.
Connect the bottom row of cubes to the basements.
4.
Finally earth the basements.
Earthing the projector
The projector also must be earthed with the earthing cables provided to
guarantee the electrical safety of the cube wall. The earthing cables are pre-
installed at the right side in each housing.
To connect the earthing cables to projector:
1.
Connect the cable of the housing to the projector.
2.
Screw the cable eyelets with the projector earthing prong.
3.
Connect all the projectors to their cube housings in the same way.
Fig. 37: Connected earthing cable at projector
EC-LED-SLIM Series
36
User Manual
Содержание EC-LED-SLIM Series
Страница 59: ...Notes...