XN3 Installation and Operating Manual
14
3.4
Earthing
3.4.1
Location of XN3 enclosure external earth bond points
There are M6 threaded earth boss bonding point situated within the junction box,
Figure 4. Removal of the front cover plate is required to access the area. Before
putting in service:
•
Perform applicable electrical safety checks.
•
Visually check integrity of seals.
Figure 4: XN3 Enclosure External Earth Bond
Points
Figure 5: External connection points
Earth bonding point
Cover retaining strap point