background image

Product Code:

Product Name:

Cequent Consumer Products  
Solon, OH 44139 USA  

www.rolaproducts.com

59 401

4 Place Bike Carrier - Folding

LOADING INSTRUCTIONS:

1.

Place the bike rack receiver into your receiver hitch.  Fit rack as close to 
vehicle as possible.

2.

Secure rack with 5/8” hitch pin and clip.  (See Diagram 3)

3.

The bikes are loaded onto the rack alternating each bike, with the anti-sway 
cradle being closest to the seat tube.  (See Diagram 4)

4.

Secure the bikes by pulling the bungee straps over the top of the bike frame.  
The anti-sway straps wrap around the seat tube prevent the bike from 
swaying.

5.

Check the bungee straps periodically and after stopping to insure that they are 
still tight and that someone has not released them.  NOTE:  Insure all locks are 
locked, that all pins are secured, and that all bungee straps are properly 
attached prior to moving the vehicle.  Failure to do so will void the warranty.

INSTRUCTIONS FOR FOLDING THE RACK:

1.

Insert the key into the lock mechanism and turn to release the lock pin.

2.

Remove the ½” pin and clip.

3.

Pull support tube firmly upwards until lower pin slides to the top of its slot.

4.

Lower the tube slowly back until support tube rests on the stop plate.
NOTE: Do not drop or let the support tube fall freely. Make sure that your

hands and fingers are clear of the hinging area during this operation.

5.

To restore the rack to the upright position, do reverse procedure. Remove
the key from the lock and push the center of the cylinder in to engage the
lock pin. A notable click will indicate that the pin is locked.

6.

Re-install ½” pin and clip. Check periodically to insure you have a solid fit
between the rack and the mounting location.

59401N   Rev B                           9-9-05

ASSEMBLY INSTRUCTIONS:

1.

Use key to unlock lock on Collar Bracket.

2.

Pull spring loaded release pin on side of Main Support tube, remove handle 
mechanism, and rotate bike Support Arms into the 

UP

position. Re-insert the handle 

mechanism. Pull out the spring loaded release pin and push handle all the way 
down.  Let the spring loaded pin go so that it fully engages the handle mechanism.

3.

Slide the Collar Bracket onto the bike carrier Main Support tube in orientation shown 
(see Diagram 1).

4.

Attach Collar Bracket to Main Support tube using one (1) ½” x 3-1/4” lg. hex bolt, two 
(2) nylon flat washers, and locknut installed through the “slotted” hole in Collar 
Bracket.  Tighten locknut until it is snug against the flat washers.

5.

Install ½” Pin and Clip through hole directly above the lock on Collar bracket.

6.

Attach Receiver piece to Collar Bracket using two (2) ½” x 3” hex bolts through the
½” diameter holes (closest to end of tube).  (See Diagram 2)

Tighten Receiver piece bolts to 75 Lb.-Ft.

7.

Lock Collar Bracket to Main Support tube so bike carrier is in the upright position.

Diagram 1

½” x 3-1/4” Hex Bolt

(2) Nylon Flat Washer

Locknut

“Slotted”

Hole

Collar Bracket

Main Support
Tube

Release Pin

Handle Mechanism

Drop of Oil

½” x 3” Hex Bolt
Locknut
(2) Places

Diagram 2

Collar
Bracket
Lock

Diagram 3

½” Pin & Clip

Anti-Sway
Cradle

Diagram 4

Diagram 5

5/8” Pin & Clip

Cequent Help Hotline: 1-800-234-6992 

Please read all instructions carefully before assembly, installation and/or use of this product.

Содержание ROLA 59 401

Страница 1: ...n to engage the lock pin A notable click will indicate that the pin is locked 6 Re install pin and clip Check periodically to insure you have a solid fit between the rack and the mounting location 59401N Rev B 9 9 05 ASSEMBLY INSTRUCTIONS 1 Use key to unlock lock on Collar Bracket 2 Pull spring loaded release pin on side of Main Support tube remove handle mechanism and rotate bike Support Arms int...

Страница 2: ...zes Take care to add padding on any area of the bikes that touches another bike or any part of the vehicle Damage can and will happen to your bikes and or to the vehicle if care is not taken during the loading and transporting of your bikes and padding used where necessary Bicycle tires should be kept at least 6 away from the exhaust pipes of the vehicle The high temperature exhaust exiting from t...

Страница 3: ...indiquera que la goupille est verrouillée 6 Réinstaller la cheville et l agrafe 1 2 po Vérifier périodiquement que le support est fixé solidement sur les points de montage 59401N Rev B 9 9 05 INSTRUCTIONS DE MONTAGE 1 Utiliser la clé pour déverrouiller le collet 2 Tirer sur la goupille de déverrouillage à ressort située sur le côté du tube support principal retirer le mécanisme de la poignée et to...

Страница 4: ... protéger toute partie des vélos qui touche à un autre vélo ou une partie quelconque du véhicule Des dommages risquent de survenir aux vélos et ou au véhicule si l on ne prend pas de précautions durant le chargement et le transport des vélos notamment le coussinage de protection lorsque nécessaire Les pneus des vélos doivent se trouver à une distance minimum de 15 cm des tuyaux d échappement du vé...

Страница 5: ...ano al vehículo como sea posible 2 Asegure la bandeja con el pasador y clip del enganche de 5 8 Ver rl diagrama 3 3 Las bicicletas se cargan en la bandeja alternando cada bicicleta con la base anti giratoria colocada más cercana al tubo del asiento Ver el diagrama 4 4 Asegure las bicicletas halando las tiras flexibles sobre la parte superior del bastidor de la bicicleta Las tiras anti giratorias s...

Страница 6: ...ial acolchonado en cualquier área de las bicicletas que toquen otra bicicleta o cualquire parte del vehículo Pueden ocurrir daños a las bicicletas y o al vehículo si no tiene precaución durante la carga y el transporte de las bicicletas y si no se usa un protector donde sea necesario Las ruedas de la bicicleta se deben mantener al menos a 6 de distancia de las salidas de escape del vehículo El cal...

Отзывы: