
114
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Summit Switch Installation
Connecting Summit 400 Series Switches
The dedicated stacking ports on the back of a Summit 400 series switch require a specific stacking cable
that is available from Extreme Networks. To connect the stacking ports on two Summit 400 series
switches, follow these steps:
1
Align the stacking cable connector with a stacking port on one switch.
2
Press the cable connector firmly into its mating connector until the cable connector is firmly seated.
3
Align and tighten the connector retaining screws.
4
Repeat steps 1 through 3 to connect the other end of the cable to a stacking port on the other switch.
Connecting Summit 200 Series and Summit 300-24 Switches
Summit 200 series and Summit 300-24 switches use the 1-gigabit Ethernet ports on the front of the
switch for stacking interconnection. The cable used depends on the specific type of installed GBIC or
mini-GBIC in the port. For more information about the cables to use with these ports, see “GBIC types
and maximum distances” on page 340.
To connect two Summit 200 series or 300 series switches for a stacking configuration, follow these steps:
1
Use an alcohol wipe or other appropriate cleaning agent to clean the cable connectors; make sure
they are free of dust, oil, and other contaminants.
2
On the first switch, align the transmit (Tx) and receive (Rx) connectors with the correct
corresponding connectors on a fiber stacking port.
3
Press the cable connectors into their mating connectors on the port until the cable connector is firmly
seated.
4
Repeat steps 2 and 3 to connect the cable to a fiber stacking port on the second switch.
Verifying a Successful Installation
After you supply power to the Summit switch, the switch performs a power-on self test (POST).
During the POST:
•
All ports are temporarily disabled.
•
The packet LED is off.
•
The power LED is on.
•
The MGMT LED flashes until the switch successfully passes the POST.
If the switch passes the POST, the MGMT LED blinks at a slow rate (one blink per second). If the switch
fails the POST, the MGMT LED shows a solid yellow light.
NOTE
See Chapter 3 for more information about Summit LED activity.
Содержание Alpine 3802
Страница 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface ...
Страница 19: ...Part 1 Common Features ...
Страница 20: ......
Страница 24: ...24 Extreme Networks Consolidated i and e Series Hardware Installation Guide Common Switch Features ...
Страница 25: ...Part 2 Site Planning ...
Страница 26: ......
Страница 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation ...
Страница 57: ...Part 3 Summit Switch ...
Страница 58: ......
Страница 106: ...106 Extreme Networks Consolidated i and e Series Hardware Installation Guide Summit Switch Models ...
Страница 116: ...116 Extreme Networks Consolidated i and e Series Hardware Installation Guide Summit Switch Installation ...
Страница 137: ...Part 4 Alpine Switch ...
Страница 138: ......
Страница 158: ...158 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series Chassis Installation ...
Страница 208: ...208 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series I O Modules ...
Страница 213: ...Part 5 BlackDiamond Switch ...
Страница 214: ......
Страница 303: ...Part 6 Switch Operation ...
Страница 304: ......
Страница 307: ...Part 7 Appendixes ...
Страница 308: ......
Страница 314: ...314 Extreme Networks Consolidated i and e Series Hardware Installation Guide Safety Information ...
Страница 368: ...368 Extreme Networks Consolidated i and e Series Hardware Installation Guide Module Technical Specifications ...
Страница 376: ...376 Extreme Networks Consolidated i and e Series Hardware Installation Guide Installing GBICs and Mini GBICs ...