
GC
VE
VS
M
T
T
VR
R1
R2
RP
D
VMS
B
GP
TS
C
CE
80
Chapter 10
START-UP
FILLING THE SOLAR CIRCUIT
Water/glycol
mixture
Symbol
Description
Symbol
Description
B
Domestic hot water cylinder
R1
Tap 1
C
Solar collector
R2
Tap 2
CE
Electronic control unit
RP
Flow rate adjuster
D
Deaerator
T
Thermometer
GC
Pump unit
VE
Expansion vessel
GP
Loading the pump unit
VS
Safety valve
M
Manometer
VR
Non-return valve
Before fi lling the pre-set pressure must be checked of the expansion vessel using a manometer.
Filling is performed as described below:
Connect a GP feed pump using a rubber pipe (e.g. manual or drill pump) to the container and tap R1.
On request the installer is supplied with the high head mobile pump for system loading (accessory - code
002160627).
Take a rubber pipe from tap R2 to the container.
The taps must be open and the shut-off valve VI must be closed (see fi gure 10.2).
Open all shut-off taps upstream from the automatic relief valves or all of the manual air-bleed valves.
Use the pump to fi ll the collector circuit with the water and glycol mixture until the fl uid starts to
escape from tap R2.
fi gure 10.5
Содержание BSV 150 ES
Страница 1: ...SOLAR KIT INSTALLATION MANUAL ...
Страница 2: ...2 ...
Страница 6: ...6 Chapter 1 WARNINGS AND SAFETY DEVICES figure 1 1 figure 1 2 ...
Страница 55: ...55 HYDRAULIC SYSTEM Chapter 8 figure 8 12 figure 8 13 figure 8 14 figure 8 15 ...