32
Chapter 5
SLOPING ROOF
Pay great attention not to ruin the gaskets on tightening and not to
create twists in the collector copper pipe: it is recommended to tighten
the joint manually and then slightly using the spanners as indicated in
the fi gure.
After having fl ushed the system, let a few drops of liquid leak out of
the joints, which have not yet been completely tightened. Then screw
the connections tight, holding the 30 mm nut blocked and turning
the 22 mm locknut until the joint is perfectly sealed. Once the plant is
pressurised, periodically check the pump unit manometer to make sure
the pressure remains stable through time.
fi gure 5.9
fi gure 5.10
fi gure 5.11
fi gure 5.12
fi gure 5.13
Содержание BSV 150 ES
Страница 1: ...SOLAR KIT INSTALLATION MANUAL ...
Страница 2: ...2 ...
Страница 6: ...6 Chapter 1 WARNINGS AND SAFETY DEVICES figure 1 1 figure 1 2 ...
Страница 55: ...55 HYDRAULIC SYSTEM Chapter 8 figure 8 12 figure 8 13 figure 8 14 figure 8 15 ...