![Express SERIES](http://html.mh-extra.com/html/express/series-h/series-h_installation-operation-and-maintenance-manual_2452458029.webp)
29
HUMIDIFIER STARTUP CHECKLIST
PRELIMINARY:
• Pre-startup Checklist completed
yes
no
If no, perform Pre-startup Checklist before starting humidifier.
STARTUP PROCEEDURE:
The prerequisites for the humidifier filling and contactor pulling in to make steam are as follows:
• Front door closed or door interlock switch pulled out
yes
no
• Water supply valve opened
yes
no
• Main disconnect switched on
yes
no
• Turn on the On-Off-Drain switch
yes
no
CONTROLS:
• Installed controls match configuration
yes
no
• Control setpoint
yes
no
• Proportional wall humidistat (HXHAM, HXHCH or HXHCG)
yes
no
• On/Off wall humidistat (HXHAA)
yes
no
• Air flow switch (HXAAE)
yes
no
• Pressure differential high velocity air flow switch (HXAAF)
yes
no
• Duct mounted, proportional high limit switch (HXHAN)
yes
no
• Wall mounted high limit humidistat (HXHAD)
yes
no
The humidifier will undergo a self-diagnostic when the power is turned on activating the LED’s and other internal components.
If the above listed prerequisites are fulfilled, the humidifier will start filling the cylinder and begin normal operation.
Started by: ________________________________________ Date of Startup: ___________________
Company: ________________________________________
Unit Serial #: _____________________ No. of Humidi
fi
ers: ______________________________________________
Model #: _________________________________ Voltage: _______ V/ ___ Ph.
Steam Output: _______ lb./hr.
Customer/Job: ___________________________ Address: ______________________________________________
NOTE
: Most water does not contain enough conductivity for full boil on initial startup and after new cylinder replacement.
Units will need to concentrate the water over a time period (up to 24 hours). It’s normal for the humidi
fi
er status to cycle
between “Filling” and “High Water” (max water level) during this time period.