background image

EXHAUSTO 3001414-2000-02-01.fm

6/8

2.3

Installation
Item 2.3.1. must be read before starting installation.

2.3.1

Dipswitch-setting
The dipswitch-setting (Fig. 6-C), requirements must 
be made before starting installation.

Factory setting: All OFF.

2.4

Commissioning
EBC 11 must be commissioned in order to obtain the 
correct chimney draught.
Please ensure following:

1. Set the potentiometer 1 and 2 to its maximum set-
ting. (Fig. 6-A and 6-B).
2. Set the pressure differential switch (PDS) at mini-
mum. The PDS is typically placed inside the chimney 
fan.
3. Start the system on step 1, boiler thermostat 1 (Fig. 
6-F lights up).
4. Wait until the PDS is connected (Fig 6-D lights up).
5. Adjust potentiometer 1 (Fig. 6-A) slowly down to 
the correct draught. If the fail-safe system indicates 
failure, increase the fan speed at the potentiometer 1.
6. Increase slowly the PDS-setting until disengage-
ment of the PDS can be registered (click sound) or 
the light (Fig. 6-D) goes out. Register the PDS-value 
of disengagement. Set the PDS to 25 Pa below the 
registered value of disengagement.
7. 2-step systems. Start step 2 on the system and 
adjust potentiometer 2 (Fig. 6-B) slowly down to the 
correct draught. Boiler thermostat 1 and 2 must be 
connected (Fig. 6-E and Fig. 6-F lights up). If the fail-
safe system indicates failure, increase the fan speed 
at the potentiometer 2.
8. Check that the fail-safe system disconnects the 
boiler. Failure can be simulated by disassembling the 
minus tube on the pressure differential switch or dis-
connect 18 during operation.
9. Check the start-up function after commissioning is 
finished.

Dipswitch

Name

OFF

ON

1

MANUAL 
RESET

Automatic reset 
after power fai-
lure and draught 
failure

Manual reset 
after power 
failure and 
draught failure

2

POST
PURGE

No post-purge

Post-purge 
period of 3 
minutes

3

PDS
CHECK

No control, indi-
cating that the 
pressure differen-
tial switch has 
been in position 
NC before star-
ting up

The pressure 
differential 
switch had to 
be in position 
NC before 
starting up

6

Содержание EBC11

Страница 1: ...EXHAUSTO 3001414 2000 02 01 fm 1 8 44 GB...

Страница 2: ...veloped to meet BS 5440 Part 1 1990 and BS 6644 1991 and other relevant European standards Functions When the boiler thermostat calls for heat the chimney fan will immediately start up on full speed W...

Страница 3: ...t 1 Opto coupler 10 230V 6 7 Boiler thermostat 1 Opto coupler 10 230V 8 24V DC supply for voltage free contact 9 LK0V DC supply for voltage free contact 10 Boiler thermostat 2 Opto coupler 10 230V 11...

Страница 4: ...connected over terminals 1 3 Connection to the boiler control Step 1 The normal start signal for the burner phase is connected to terminal 6 Loop terminals 7 and 14 The start signal for the boiler com...

Страница 5: ...cted over to terminal 6 Loop terminals 7 and 14 The start signal for the boiler comes on from terminal 15 Connect neutral from the timer to terminal 4 Neutral for the boiler can be taken from ter mina...

Страница 6: ...egistered click sound or the light Fig 6 D goes out Register the PDS value of disengagement Set the PDS to 25 Pa below the registered value of disengagement 7 2 step systems Start step 2 on the system...

Страница 7: ...SEE THE WARNING Permanent light in ALARM diode Fig 7 A The chimney fan light is on FAN Fig 7 D Failing chimney draught 1 If PDS light is on Fig 7 E press the RESET but ton for one second Fig 7 B PLEA...

Страница 8: ...Graben 40 D 55411 Bingen Kempten Tel 49 6721 9178 0 Fax 49 6721 9178 99 E mail exhausto sparkasse net www exhausto de EXHAUSTO NORGE A S Enebakkveien 117 N 0680 Oslo Tel 47 2268 9006 Fax 47 2268 0384...

Отзывы: