Maintenance
Copper and G.fast/VDSL2/ADSL2+ Multi-play Test Set
419
Battery
storage period, verify the battery level and recharge the battery when
necessary, so its charge level remains around 50 % of the total capacity.
This will ensure that you get the optimum performance out of the battery.
If the battery capacity remains low or outside the previously stated values,
it should be replaced. This could occur after 3 years depending on the
usage. If your current battery capacity is lower than 8000 mAh, replace the
battery.
Unit Temperature Handling
When the battery temperature reaches
55 °C, the unit temperature is
displayed in the bar at the top of the unit and a warning message will
appear. Tests stop automatically when the battery temperature
reaches 60 °C.
Replacing the Single Battery
Single-battery replacement should only be done by a qualified technician
with the appropriate tools on an electronic bench or similar environment.
To replace the single battery:
1.
Remove all 4 screws of the battery back panel using a 1.5 mm Allen
key. Put aside the screws and the panel keeping the inside foam seal
clean. See
2.
Pull out the old battery using your fingers. Flipping the unit, battery-side
down, will ease removal. Do not use tools in order to prevent damage
to the battery envelope. Pull out the electrical connector. Put aside the
old battery.
W
ARNING
Only use an EXFO battery. Batteries from other suppliers could
result in serious damage to the MaxTester or personal injuries. See
Contacting the Technical Support Group
information on contacting EXFO.
Содержание MAX-635G
Страница 1: ...User Guide Copper and G fast VDSL2 ADSL2 Multi play Test Set MAX 635G www EXFO com ...
Страница 10: ......
Страница 16: ...Introducing the MAX 635G 6 MAX 635G Using the MaxTester Back Single battery Battery Door Screws Screws Stylus ...
Страница 26: ......
Страница 162: ......
Страница 218: ......
Страница 270: ...TDR 260 MAX 635G Continuous Examples of Common Faults Short Fault ...
Страница 271: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 261 Continuous Open ...
Страница 272: ...TDR 262 MAX 635G Continuous Bridged Tap ...
Страница 273: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 263 Continuous Splice Joint ...
Страница 274: ...TDR 264 MAX 635G Continuous Peak Function ...
Страница 275: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 265 Continuous Dual Trace View ...
Страница 276: ...TDR 266 MAX 635G Continuous Load Coil ...
Страница 290: ......
Страница 336: ......
Страница 414: ......
Страница 424: ......
Страница 432: ......
Страница 438: ......
Страница 444: ......