Setting Up the MAX-635G
32
MAX-635G
Battery Info
Modem Power OFF
:
Immediately
for when a DSL/IP test is completed or stopped. In
this mode, the modem is powered on when DSL/IP test starts.
Idle values power off the modem within a defined period after an
DSL/IP test is completed or stopped.
Power Save Mode
is either
Disable
/
Enable
. When enabled,
BATTERY
Idle timeout
and
BATTERY suspend timeout
are set to
5 min
,
Backlight
to
50 %
, and
Modem Power OFF
(including the unit) to
Immediately
. The selections are limited and the following warning
message will popup:
Power Save mode is enabled. High Voltage Monitoring is active
only while the test is in progress.
Default
power scheme settings are:
LCD backlight turns off after system idles (no keys pressed) for 10 min.
Unit switches to suspend mode after timeout: 10 min.
Power Save Mode
is
Disable
requiring you to go to this page to see
what will be changed before enabling it.
The chart displays the following battery measurements: capacity, current,
and voltage.
Battery Status
indicates the current power level, as a
percentage, for the battery.
Charging
is shown as the status only in dual
battery pack units.
To change the power scheme settings:
1.
Press ,
select
System Settings
, and then
Battery Info.
2.
Under
DC IN
or
BATTERY
, use the arrow keys to select
Idle
/
suspend
timeout
modes. Press
to view the list of available choices or use
the left/right arrow keys.
3.
Select a new value, then press
to confirm the choice. Repeat for
the other modes as needed.
Содержание MAX-635G
Страница 1: ...User Guide Copper and G fast VDSL2 ADSL2 Multi play Test Set MAX 635G www EXFO com ...
Страница 10: ......
Страница 16: ...Introducing the MAX 635G 6 MAX 635G Using the MaxTester Back Single battery Battery Door Screws Screws Stylus ...
Страница 26: ......
Страница 162: ......
Страница 218: ......
Страница 270: ...TDR 260 MAX 635G Continuous Examples of Common Faults Short Fault ...
Страница 271: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 261 Continuous Open ...
Страница 272: ...TDR 262 MAX 635G Continuous Bridged Tap ...
Страница 273: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 263 Continuous Splice Joint ...
Страница 274: ...TDR 264 MAX 635G Continuous Peak Function ...
Страница 275: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 265 Continuous Dual Trace View ...
Страница 276: ...TDR 266 MAX 635G Continuous Load Coil ...
Страница 290: ......
Страница 336: ......
Страница 414: ......
Страница 424: ......
Страница 432: ......
Страница 438: ......
Страница 444: ......