20
|
P
a
g
e
For
proper
plumbing,
refer
to
the
overview
diagram
below
.
Flow
switch
:
IMPORTANT:
To
insure
proper
operation,
verify
that
the
arrow
on
the
flow
switch
(located
on
the
side)
points
in
the
same
direction
of
water
flow
.
Electrolytic
Cell:
Install
using
the
unions
provided.
Tighten
by
HAND
for
a
watertight
seal.
For
pool/spa
combination
systems
with
spillover,
use
configurations
#2
or
#3
above
to
allow
chlorination
for
both
the
pool
and
spa
during
spillover
but
preventing
over
chlorination
when
operating
the
spa
only.
Содержание Excelpool Salt System
Страница 11: ...10 P a g e POUNDS and Kg OF SALT NEEDED FOR 3200 PPM Gallons and Liters of Pool Spa water...
Страница 31: ...NOTES 30 P a g e...
Страница 32: ...excelpoolproducts com...