![Evolve SHOWROOMS Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/evolve/showrooms/showrooms_installation-manual_2447283049.webp)
EVOLVE
evolvefurnituregroup.com • Page
49
Double Wall Overhead Glazed Door
Identify both left and right gables and determine their location on panel
STEP 1: Insert hooks of metal brackets into panel slot and pull gable down-
ward and tap with rubber mallet to ensure connection.
STEP 2: Push bottom bracket up and tighten cap nut to secure gable.
Bottom and Middle Shelf
STEP 3: Install PVC lip on bottom shelf by putting iton shelf lip and pushing
upward and forward shelf until it snaps on.
STEP 4: loosen cap nuts, position bottom shelf between gables, drop shelf
front on front studs, slide shelf forward.
STEP 5: Drop back of shelf on back studs, tighten the cap nuts.
Top Shelf
STEP 6: Loosen cap nuts, position top shelf between gables, drop shelf
back on back studs, slide shelf backward.
STEP 7: Drop front of shelf on front studs, tighten the cap nuts.
To install Glazed Sliding Door
STEP 8: Loosen front cap nuts of top shelf
STEP 9: Put Glass in upper tracks, lift top shelf front and put Glass in bot-
tom tracks, slide glass to middle and tighten cap nuts of top shelf.
To install Metal Handle
STEP 10: Take rubber and peel of protective paper, place rubber on glass
STEP 11: Slide Metal Handle on rubber.
INSTALLATION GUIDELINES
Содержание SHOWROOMS
Страница 1: ...Evolve Installation Guide ...
Страница 24: ...EVOLVE Page 24 evolvefurnituregroup com INSTALLATION GUIDELINES Evolve Panel Removal ...
Страница 42: ...EVOLVE Page 42 evolvefurnituregroup com 4 6 8 5 7 9 INSTALLATION GUIDELINES ...
Страница 52: ...EVOLVE Page 52 evolvefurnituregroup com INSTALLATION GUIDELINES ...