51
SERVICING
evo HE C -
Installation and Servicing
1.
Refer to Frame 57.
2.
Remove the casing front & bottom panel.
Refer to Frames 49 & 50.
3.
Remove the 2 screws and allow the user control to lower.
4.
Push out the mains switch from the rear, as shown.
5.
Fit the new switch, ensuring that the electrical leads are
replaced on the correct terminals (refer to Frame 41) and
the key on the switch is correctly aligned with the slot in the
plastic moulding.
72 MAINS SWITCH REPLACEMENT
71 CONTROL BOX REPLACEMENT
1.
Refer to Frame 57.
2.
Remove the casing front & bottom panel.
Refer to Frames 49 & 50.
3.
Swing the control box down into the servicing position.
Refer to Frame 51.
4.
Unplug the user control electrical lead and low voltage
lead from the control box and remove the control. Refer
to diagram
A
.
5.
Return the control box to the working position and
secure with the clamp. Unscrew the mounting bracket
screws to remove the bracket. Refer to diagram
B
.
6.
Release the clamp and carefully remove the control box
from the hinge arms. Refer to diagram
C.
7.
Unplug all the electrical wiring from the control box and
remove.
8.
Transfer mounting bracket and hinge arms to the new
control box.
9.
Reassemble in reverse order, ensuring that the control box
is located correctly in the housing before reconnecting the
electrical wiring.
10.
Check operation of the boiler. Refer to Frames 45 & 46.
6.
Reassemble in reverse order.
7.
Check operation of the boiler. Refer to Frames 45 & 46.
SER
VICING
Содержание C22/24
Страница 2: ...2 evo HE C Installation and Servicing ...
Страница 65: ...65 SHORT LIST OF PARTS evo HE C Installation and Servicing 95 SHORT LIST nm9571a 103 98 ...
Страница 67: ...67 evo HE C Installation and Servicing ...
Страница 68: ......
Страница 70: ...Gas Safe Register ID Number ...