SETTING INTO OPERATION / COMMISSIONING
Evinox Commissioning Engineers
The unit should be commissioned by Evinox Energy commissioning engineers to
validate the warranty unless otherwise specified by Evinox Energy.
System Checklist Prior Commissioning
It is important that the system is fully ready for the works to be carried out.
Report to Evinox
If there is a problem with the unit, isolate it from the hydraulic connections and
the power (if necessary) and report to Evinox Energy.
Pre-commissioning checklist
Pre-requisite of Commissioning
1
Primary network and plant room fully operational and complete (including water
treatment) in line with these instructions
2
Secondary system fully operational including water treatment in line with these
instructions
3
The ModuSat® unit is installed as per the hydraulic connections in line with these
instructions
4
Electric connections and supply is complete and all controls functional in line with
these instructions
5
Evinox SmartTalk system installed, tested and operational (including the broadband
connection
6
Apartment reference and postal address schedule issued to Evinox
Содержание ModuSat XR ECO CHHC
Страница 1: ...1 2551868A Evinox ModuSat XR ECO CHHC Combined Heating Hot Water and Cooling...
Страница 9: ...9 2551868A Typical Dimensions...
Страница 32: ...32 2551868A WRAS CERTIFICATE...