3 - INSTALLATION
EN
THIS MANUAL IS PROPERTY OF EUROTECNO S.R.L.
– REPRODUCTION, EVEN PARTIAL, IS FORBIDDEN.
3 - 5
Steps
Tasks
1
The ceiling support plate (step A, paragraph 3.5.1.1) contains holes with a 9-mm diameter
through which will be fastened the Maior Omnia® (lift). For the fastening process, make use of
appropriate screw anchors depending on the type of support (ceiling material).
WARNING
:
According to the type of ceiling, will be needed adequate anchoring systems
(screw anchors). For further information, see paragraph 6.2 "Anchors
specifications".
2
Place the assembly template in the area that has been chosen to install the device and trace
the reference holes, paying attention to the front cables passage of the support plate.
3
Remove the assembly template and drill with the pre-drilling bit (whose diameter is a few
millimetres smaller than the definitive one). This procedure ensures that the hole is as precise
as possible for the screw anchor to be inserted.
NOTE
:
Disab
le the ‘hammer’ function of the drill, as this can damage the sides of the hole:
this is incompatible with a correct placement of the chemical anchors.
4
Drill the diameter indicated for the screw anchor.
NOTE
:
Disab
le the ‘hammer’ function of the drill, as this can damage the sides of the hole:
this is incompatible with a correct placement of the chemical anchors.
5
ANCHORING WITH SCREW ANCHORS
Insert the screw anchors (previously identified), paying attention to the assembly
specifics provided by their manufacturers.
ANCHORING WITH BARS AND CHEMICAL ANCHORING
Clean with air the inner part of the hole;
Introduce the chemical anchoring into the hole;
Insert the bars: each one of the bar extremities shall protrude from 1,5 cm up to 2 cm;
Check, with the assembly template, the correct position of the bars.
Let the chemical anchoring harden for the requested time.
NOTE
:
We recommend to let the chemical anchoring harden for one day.
6
Place the support plate in the ceiling, by introducing the bars into the holes of the support.
Make
the device cables pass from the inner part of the support plate’s central hole, then screw
the nuts in the bars (gradually for each bar).
Screw definitely the nut of each bar with the socket wrench, paying attention to the consequent
reaction during the operation. If a bar results incorrectly fastened, repeat the process.
7
Position the device in the tracks of the ceiling support plate, following the installation procedure
indicated in paragraph 3.5.1.1 (steps from A to G) and 3.5.1.2 (steps from A to H).
Table 3 - 2
Содержание Maior Omnia
Страница 2: ...THIS MANUAL IS PROPERTY OF EUROTECNO S R L REPRODUCTION EVEN PARTIAL IS FORBIDDEN ...
Страница 4: ...THIS MANUAL IS PROPERTY OF EUROTECNO S R L REPRODUCTION EVEN PARTIAL IS FORBIDDEN ...
Страница 6: ...THIS MANUAL IS PROPERTY OF EUROTECNO S R L REPRODUCTION EVEN PARTIAL IS FORBIDDEN ...