D00219 Revision E
– 2019-07-19 - Page 9
IV. QUICK START GUIDE
After setting up the system as described above, PinScan is ready to operate. This section
covers the steps necessary to create a quick no-frills test, without considering options or
customization. The quick start process is as follows:
START PROCEDURE:
•
After launching the PinScan Test Manager , t
he yellow banner will display “PinScan System
READY” indicating that PinScan is in the “Ready Mode”.
•
The system is controlled by the buttons across the top of the window. The first 2 buttons
allow selection of viewing a previous test (“
REVIEW & VIEW
”) or creating and running a
new test (“
RUN TEST
”). The “
GO
” button is the global control indicating that the
operator approves, and the system will move ahead to the next step. The “
” button
sends an image of the entire operator screen to the current default printer. The “
STOP
”
button halts the setup or testing process.