D00219 Revision E
– 2019-07-19 - Page 12
4.6. SELECT THE ESD MODEL
Leave this model as-is:
4.7. SELECT THE CURVE TRACE OPTION
Click on Option 2
–
CT after each discharge:
Accept these 3 options by clicking GO.
4.8 RUN THE TEST.
The system is now ready to begin the test. Click GO
***
TESTING BEGINS
***
PinScan starts the following sequence of actions:
•
The PinScan transport will move to the first pin pair specified by the PinScript.
•
The first activity for each pin pair
will be to perform an initial Curve Trace as the “before”
or baseline trace for the pin pair. This will be displayed as a zero-voltage curve.
•
PinPulse 9910 will display on its front panel the first Voltage in the Voltage Script, and
the system will perform a discharge at this Voltage.
•
The after-discharge Curve Trace will be performed.
•
PinScan will step to the next pin-pair and voltage, as instructed by the scripts.
•
Once all voltages and pin pairs have been completed, the PinScan Test Manager will
return to READY status.
4.9 MONITORING THE TEST
As PinScan follows the sequence dictated by the scripts. The Test and Return Pin numbers
can be viewed during the test at the lower left Test Status section of the screen, as shown
below. The PinScript and Voltage Script step numbers are shown. Also displayed are the
present discharge voltage, the time stamp, and the computed PinCheck number for the last
Curve Trace. Consult the PinScan Operating Manual for a full description of PinCheck
numbers.