Images are for illustrative purposes.
We reserve the right to make changes.
RDT-59-0322
17
®
NORD
canopy
|
EOZ installation guide
Control panel and I/O cable wiring
Next, install the I/O data cable for your building automation system or for future upgrades rout the I/O cable to
the junction box.
Connect the five (5) terminals DI1, DI2, DO1, DO2 and COM+ and mark the other ends of the wires within the
junction box with their corresponding terminal assignments.
Rout the other end to a junction box that is situated near or on top of the EOZ unit.
Never drill or screw into the EOZ chassis.
Junction box
Control panel
PLC / Building automation
I/O cable
DI2
DI1
COM+
DO2
DO1
L
PLC
I/O