88
Remove starter reduction gear and shaft.
Pull out flywheel with A.C.G. flywheel puller.
Special tool:
A.C.G. Flywheel puller
Remove flywheel and starting driven gear.
10-7 Starting Clutch
Starting Clutch Inspection
Remove starting clutch driven gear.
Check the gear for wear or damage.
Measure the ID and OD of the starting clutch
driven gear.
Service Limit: ID: 25.1 mm
OD: 42.10 mm
Check the starting reduction gear and shaft for
wear or damage.
Check each roller for wear or damage.
flywheel puller
ID
OD
Содержание VECTOR 250 - SERVICE
Страница 114: ...114 Handle bar...
Страница 120: ...120 Install the steering shaft nut and tighten it This nut is under this steering shaft Torque 50 N m 37 lbf ft...
Страница 128: ...128 REAR BRAKE...
Страница 149: ...149...
Страница 150: ...150 12 8 WIRING DIAGRAM...