![Eton VECTOR 250 - SERVICE Скачать руководство пользователя страница 83](http://html1.mh-extra.com/html/eton/vector-250-service/vector-250-service_service-manual_2433911083.webp)
83
Align the position mark on the shift spindle
sprocket with that of shift drum, and then install
shift spindle.
Install dowel pins and new gasket.
Install gear box cover and bolts, and tighten.
Torque value: 1.0~1.4kgf-m
Install the shift spindle bracket, drive chain
protector, speedometer gear box and gear change
lever.
Add gear oil.
Gear oil quantity: 750c.c.
Position mark
Dowel pins
9 bolts
Содержание VECTOR 250 - SERVICE
Страница 114: ...114 Handle bar...
Страница 120: ...120 Install the steering shaft nut and tighten it This nut is under this steering shaft Torque 50 N m 37 lbf ft...
Страница 128: ...128 REAR BRAKE...
Страница 149: ...149...
Страница 150: ...150 12 8 WIRING DIAGRAM...