background image

20

Exhaust  Venting  Installation

This water heater must be properly vented for removal of

exhaust gases to the outside atmosphere. Correct instal-
lation of the vent pipe system is mandatory for the safe and
efficient operation of this water heater and is an important

factor in the life of the unit.

Vent pipe  installation must be performed  in accordance

with state and local codes, or in the absence of such, the
latest edition of National Fuel Gas Code, NFPA 54/ANSI
223.1. Canadian installations must be performed in accor-

dance with CAN/CGA-B149.

VENT PIPE  MATERIAL

Eternal Hybrid Water Heater is  a gas  burning appliance

with fan-assisted exhaust. The appliance must be vented
with 4"  Category III special venting, which is air  tight to
prevent leakage of exhaust gases.

The appliance must  be vented separaely  from all  other
appliances. The following type of non-metallic vent can be

used:
      PVC (schedule 40, ASTM-D1785)
      CPVC (schedule 40, ASTM-D2846)

      ABS (schedule 40, ASTM-D2661)

Category III metallic venting may be used with the appliance,

we recommend:
       ZFlex line of venting by Z-Vent  with adaptor NA2SVSNA04
      GVent line of venting by Grand Hall

Sealant (silicon based) is recommended with metallic vent-
ing to ensure proper seal.

VENT  PIPE  INSTALLATION

The following guidelines should be followed when install-
ing the exhaust outlet piping:

- Venting should be as direct as possible with a minimum
number of pipe fittings.

- Venting diameter must not be reduced unless specially
noted in the installation instructions.

- Support all horizontal pipe runs every four feet according
to local codes.

- Vents run through  unconditioned spaces where below
freezing temperatures are expected should be properly in-
sulated to prevent freezing. For horizontal runs, wrap the

vent pipe with self-regulating 3 or 5 watt heat tape. The heat
tape must be U.L. listed and installed per the manufacturer's
instructions.

- Do not connect this venting system with an existing vent or
chimney.

- Do not connect common vent with the vent pipe of any
other water heater or appliance.

The exhaust outlet piping and termination may be installed
in one of the following terminations:

1. Standard Horizontal (see page 22)
2. Vertical (see page 22)

All pipe, fitting, pipe cement, primers and procedure must
conform to American National Standard Institute and Ameri-

can Society for Testing and Materials (ANSI/ASTM) stan-
dards in the United States.

CEMENTING  PVC,  ABS  or  CPVC  PIPE  and  FITTING

All  primers,  cleaners and cements must  meet  all  local
codes and applicable standards of the American Society
for Testing Materials.

Before using primers, cleaners and cements, stir or shake,
making sure contents are liquid. Do not use if found to be

lumpy or jelly-like.

1.  Cut pipe ends squarely removing all burrs and dirt.

2.  Dry fit pipe and fittings to be connected for proper fit.
3.  Clean pipe and fitting with a primer/cleaner.
4.  Apply a thin coat of cement to fitting, avoiding pudding

     inside.
5.  Apply a liberal coat of cement to pipe leaving no voids.
6. Quickly assemble parts while cement is fluid.

7. Push pipe completely into socket of fitting, turning as
    it goes until it bottoms.
8. Hold pipe and fitting together for 30 seconds. Then

    carefully clean off excess with a cloth.
    Allow connections a sufficient time to cure before
    disturbing.

9. Remember that vent pipes must be adequately and
    securely supported.

CUTTING  OPENING  THROUGH AN  OUTSIDE  WALL
AND  TERMINATOR  INSTALLATION

The 4" PVC, ABS or CPVC Schedule 40 vent pipe can be

run from the water heater through the wall or from the
wall to the water heater, whichever is most convenient.

The vent pipe must extend a minimum of 1.5" through
the exterior wall. Note that inside collars must be slipped
over the vent piping before locating the pipe through the

wall.

Before securing the inside and  outside collars to the

wall, use a silicone sealer between pipe and opening to
ensure water and air tight seal.

To prevent condensate from collecting in the venting sys-
tem slope the vent at a downward pitch of 1/4" per 12 ft.
with condensate trap.

This water heater has been design certified by CSA Intern-
ational for use with the specified listed plastic vent pipe.

NOTICE

!

!

For installations in Canada,field supplied plastic

vent piping must comply with CAN/CGA B149 1

(latest edition)and be certified to the Standard For

Type BH Gas Venting Systems,ULC S636 Com-

ponents of this listed system shall not be inter-

changed with other vent systems or unlisted pipe/

fittings. All plastic components and specified prim-

ers and glues of the certified vent system must be

from a single system manufacturer and not inter-

mixed with other system manfacturer's vent sys-

tem parts.

The supplied vent connector and vent termination
are certified as part of the water heater.

 puddling

Содержание GU26DV

Страница 1: ...ay WARNING California Proposition 65 lists chemical substances known to the state to cause cancer birth defects death serious illness or other reproductive harm This product may contain such substance...

Страница 2: ...be filled with water Water must be running from the hot water faucet before turning the main gas valve to the water heater to ON WARNING CAUTION If you do not follow these instructions exactly a fire...

Страница 3: ...al gas valve located on the outside of the unit to the off position Wait five 5 minutes to clear out any gas If you smell gas STOP Follow B in the safety information above If you don t smell gas go to...

Страница 4: ...4 Parts Diagrams for Model GU32DV 505 11 12 1321...

Страница 5: ...06 1 7 Panel Bottom 151010009 1 8 Control Panel Assembly 301080170 1 9 Temperature and Pressure Relief Valve 194010281 1 10 Intake Collar Assembly 307060517 1 11 Top Packing 151010200 1 12 Plug 601020...

Страница 6: ...Parts Diagrams for Model GU26DV 505 11 12 1261 6...

Страница 7: ...06 1 7 Panel Bottom 151010009 1 8 Control Panel Assembly 301080170 1 9 Temperature and Pressure Relief Valve 194010281 1 10 Intake Collar Assembly 307060517 1 11 Top Packing 151010200 1 12 Plug 601020...

Страница 8: ...will turn off automatically WHATTO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch Do not use any phone in your building Immediately call your gas supplier fro...

Страница 9: ...re Press the HOT or COLD Temperature Setting Button with unit ON Temperature setting is only adjustable when the water heater is not in use The maximum water temperature setting can be limited by DIP...

Страница 10: ...a self cleaning system initiated by the flow of water Build up of sediment in faucet aerators shower heads and screens could impair water flow and cause the water heater to deliver less than its full...

Страница 11: ...n A secondary air hole thermistor short open A vent condition is not normal Temperature too high on a burner thermistor Mixing control valve is not connected Mixing control valve initialization failur...

Страница 12: ...bove sea level contact the manufacturer for high 0 5 to 9 1 Gal min 100 102 104 106 108 110 112 114 116 122 131 140 149 158 167 F 15 steps 9 1 Gal min ITEM MODEL NAME TYPE IGNITION DIMENSIONS OPERATIO...

Страница 13: ...bs 120 VAC 60 Hz Specifications GU26DV 505 11 12 1261 Indoor Sealed Direct Vented Direct Ignition 13 Natural Gas Max 180 000 btu hr Min 47 500 btu hr L P Gas Max 180 000 btu hr Min 47 500 btu hr 45 F...

Страница 14: ...himney or gas vent The appliance should be located in an area where leakage of the tank or connections will not result in damage to the area adjacent to the appliance or to lower floors of the structu...

Страница 15: ...Relief Valve x 1 Intake Top x 1 O Ring G95 x 1 Exhaust Collar x 1 Valve Adaptor x 1 Orifice for LPG x 1 LPG Label x 1 Top Packing x 1 Mesh Screen x 2 Self Tapping Screw T4x16 x 5 Philips Head Screw M...

Страница 16: ...4 screws Install the T P Relief Valve on the side of unit Make sure the T P Relief is secured tight to prevent water leak For indoor installation please install the Top Packing before connecting PVC o...

Страница 17: ...xhaust outlet and air inlet terminals shall terminate at least 18 inches above the roof surface 0 clearance for 4 PVC ABS OR CPVC Schedule 40 piping from combustible surfaces The venting system must b...

Страница 18: ...cal or Horizontal run in Length 40 ft Power Direct Venting Rule 18 When determining the installation location for a power direct vent water heater snow accumulation and drifting should be considered i...

Страница 19: ...haust gases The venting system must be installed in a manner which allows inspection during the installation of the venting pipes and joints as well as periodic inspec tion after installation as requi...

Страница 20: ...ional Standard Institute and Ameri can Society for Testing and Materials ANSI ASTM stan dards in the United States CEMENTING PVC ABS or CPVC PIPE and FITTING All primers cleaners and cements must meet...

Страница 21: ...om the center line of the terminal E 12 inch min clearance to unventilated soffit F Clearance to outside corner G 2 feet clearance to inside corner formed by two exterior walls H 4 feet clearance to e...

Страница 22: ...o the left Complete the rest of the vent pipe installation to thewaterheater sventconnector fittingontheblower outlet If necessary support horizontal run as previously mentioned The vertical inlet and...

Страница 23: ...3 7 9 3 4 7 3 2 3 3 0 8 2 7 6 2 5 3 2 1 3 1 1 4 2 2 0 6 1 4 9 7 1 2 1 3 1 0 4 0 9 1 4 8 3 5 7 7 2 7 2 5 6 7 8 6 3 1 5 6 7 5 1 1 4 4 0 1 1 2 3 3 0 8 2 3 0 0 1 8 5 9 1 5 6 0 1 4 1 8 1 2 7 6 1 1 8 2 1 0...

Страница 24: ...Be careful not to reverse the hot water outlet and cold water supply line connections to the water heater This will cause your heater to operate dan gerously and void warranty Make sure the hot and c...

Страница 25: ...ions in the State of California CAUTION California Law requires that residential water heaters must be braced anchored or strapped to resist falling or horizontal displacement due to earthquake motion...

Страница 26: ...be electrically grounded Label all wires prior to disconnection when servic ing controls Wiring error can cause improper and dangerous operation Verify proper operation after servicing CAUTION The wa...

Страница 27: ...28 PV switch 5 OFF switch 4 Test selection switch 2 switch 3 Temperature selection 1 switch 2 Temperature selection 2 switch 1 Temperature selection 3 O N 8 7 6 5 4 3 2 1 switch 8 Reserved switch 7 Re...

Страница 28: ...m axim umtem perature by selection switch O N 3 2 1 104 O N 3 2 1 110 O N 3 2 1 114 O N 3 2 1 122 O N 3 2 1 131 O N 3 2 1 140 O N 3 2 1 149 O N 3 2 1 167 Limitation of maximum temperature by selection...

Страница 29: ...2 screws securing the Control Panel Assem bly to the frame and remove the Assembly from Water Heater Loosen 2 screw and the nut of the gas pipe and insert with Orifice LP Tighten the loose nut to mak...

Страница 30: ...Valve Adaptor LP Reverse the steps above by reassembling the packing Gas Flange and Connector Bracket Make sure all screws and secure and tightened Change Dip Switch No 8 position from left to right 8...

Страница 31: ...31 Recirculation System With A Grand Hall Water Heater Do not run circulation pump over two hours when install with timer Pump on time is should be less than two hours CAUTION...

Страница 32: ...You are responsible for shipping charges of such replacement parts This Warranty does not cover any failures or operating difficulties due to accident abuse misuse alteration misapplica tion vandalis...

Отзывы: