46
www.eta.co.at
Subject to change due to technical improvements
Discharge conveyor with screw
Pellet store
Discharge conveyor with screw
Open feeder screws with 1,000 mm,
1,500 mm and 2,000 mm, can be
combined for total length up to 5,000 mm.
Choose a screw length (open feeder) at least
100 mm shorter than the unobstructed room
length (length can be up to 600 mm shorter)
End bearing pin
(included in basic set)
Connection pin for connecting the screws
(fi rst connection pin included in basic set;
for each additional screw a pin is needed)
Flange plate with
bearing (included in
basic set)
Basic set for pellet discharge
conveyor channel
Wall sheath
Maintenance cover
Drive motor
Screw end piece
Hose connection DN50
back air from boiler
Hose connection DN50
Pellets to boiler
Wall, 300 mm
maximum
Hose connections
Maintenance cover
with fireproof wadding
Modular discharge screw system
Discharge conveyors with screws are preferable since they can completely empty the storage room.
Screw discharge conveyors are available up to a maximum length of 5.0 m in steps of 0.5 m.
ETA PE
max. 5.00 m
1.00 m
2.00 m
2.00 m
1.
20
m
at least 0.36 m
0.66 m
max. 0.30 m
ap
pr
ox
. 0
.2
0
m
ap
pro
x.
0.2
0 m
2 3
1 3
40°
at least 0.5 m
max. 6.50 m
0.5 m
Filling nozzle
(centred, 2 nozzles
offset in rooms
wider than 3m)
27 mm formwork panels
(smooth surface)
Wooden
beams
No transfer of forces from tilted
floor to walls with insufficient strength
Ventilation at least 200 cm²
Fireproof sleeve
Support frame
Pellet store
Panelling
Wooden
beams
Empty
space
Back air nozzle
Example for conveyor channel 2x2 m + 1x 1 m + 2x connection pin
Boiler room
Discharge screw
Im
pa
ct
p
ro
te
ct
io
n
Pellet store door
T30 with wooden panelling
Longitudinal section
Cross section
320 x 250 mm wall opening
Suc
tion
and b
ac
k
ai
r ho
se
, 20 m or
les
s
sh
ee
t
W
all opening, height 250
View against conveyor direction
25 Height adju/-10
Wall opening, width 320
Содержание PE-K 35
Страница 1: ...PE K pellet boiler 35 to 90 kW Installation PE K installation 35 to 90 kW 2012 02 2012 02 18 EN...
Страница 17: ...17 PE K installation 35 to 90 kW 2012 02...
Страница 25: ...25 PE K installation 35 to 90 kW 2012 02...
Страница 37: ...37 PE K installation 35 to 90 kW 2012 02...
Страница 56: ...56 www eta co at Subject to change due to technical improvements...
Страница 57: ...57 PE K installation 35 to 90 kW 2012 02...
Страница 58: ...58 www eta co at Subject to change due to technical improvements...
Страница 59: ...59 PE K installation 35 to 90 kW 2012 02...