28
www.eta.co.at
Subject to change due to technical improvements
Attaching the pellet bin Installation
Check freedom of movement of stoker screw
In the combustion chamber, check the stoker
screw's clearance (1 - 2 mm) from the bottom of
the stoker channel.
The stoker screw may not contact the channel
bottom.
Install pellet bin on stoker
Attach the pellet bin to the stoker with 4 M5 x 20
hex-head screws and 2 washers each.
Install struts on pellet bin
Install both struts to support the pellet bin; attach
them to the extension frame and the pellet bin
using 2 M8 x 16 hex-head screws and washers for
each.
Adjust pellet bin
Adjust for uniform spacing between pellet bin and
boiler to prevent contact with the casing later.
Screw
Channel base
Attaching the pellet bin
M5 x 20
M8 x 16
Struts
Содержание PE-K 35
Страница 1: ...PE K pellet boiler 35 to 90 kW Installation PE K installation 35 to 90 kW 2012 02 2012 02 18 EN...
Страница 17: ...17 PE K installation 35 to 90 kW 2012 02...
Страница 25: ...25 PE K installation 35 to 90 kW 2012 02...
Страница 37: ...37 PE K installation 35 to 90 kW 2012 02...
Страница 56: ...56 www eta co at Subject to change due to technical improvements...
Страница 57: ...57 PE K installation 35 to 90 kW 2012 02...
Страница 58: ...58 www eta co at Subject to change due to technical improvements...
Страница 59: ...59 PE K installation 35 to 90 kW 2012 02...