35
PE-K installation 35 to 90 kW
2012-02
Installation
Installing the ash box
Attach handles to ash box
Attach both handles to the ash box with two M8 x
20 Allen screws each.
Screw in levelling feet
Attach an M8 hex nut to each levelling foot and
loosely screw the levelling feet into the underside
of the ash box.
Attach adjustment bracket for wheel
Attach the adjustment bracket to the ash box with
the M8 x 20 hex-head screws and M8 washers. Do
not tighten the screws yet.
Attach mounting bracket with round-headed
screws
Attach the mounting bracket for the handle bar
with the four M8 x 20 round-headed screws.
Attach axle and wheels
Insert the axle and slide a wheel onto it at each
end. Secure the wheels with the M8 acorn nuts.
Put cover on ash box
Place the cover on the ash box and secure it with
both latches.
Handle
Levelling
foot
Adjustment
bracket for wheel
Acorn nut
Cover
Mounting bracket
Installing the ash box
Содержание PE-K 35
Страница 1: ...PE K pellet boiler 35 to 90 kW Installation PE K installation 35 to 90 kW 2012 02 2012 02 18 EN...
Страница 17: ...17 PE K installation 35 to 90 kW 2012 02...
Страница 25: ...25 PE K installation 35 to 90 kW 2012 02...
Страница 37: ...37 PE K installation 35 to 90 kW 2012 02...
Страница 56: ...56 www eta co at Subject to change due to technical improvements...
Страница 57: ...57 PE K installation 35 to 90 kW 2012 02...
Страница 58: ...58 www eta co at Subject to change due to technical improvements...
Страница 59: ...59 PE K installation 35 to 90 kW 2012 02...