24
www.eta.co.at
Maintenance (expert)
Cleaning and maintenance
2.6.7
Establish operational readiness
Switch the boiler on via the mains switch and start
de-ashing
Restore the boiler's power supply from the mains
switch. Start de-ashing, so that the boiler can perform
de-ashing. Switch the boiler back on with the On/Off
switch.