14
www.eta.co.at
Cleaning (customer)
Cleaning and maintenance
Re-attaching the maintenance cover and panels
Place both maintenance covers and tighten the screws
evenly and cross-wise.
Fig. 2-21: Maintenance cover
Finally, place the insulating cover and re-attach the
panels.
Fig. 2-22: Panels and insulating cover
Re-install the panel next to the flue gas connections.
Fig. 2-23: Panel
2.5.4
Establish operational readiness
Switch the boiler on via the mains switch and start
de-ashing
Restore the boiler's power supply from the mains
switch. Start de-ashing, so that the boiler can perform
de-ashing. Switch the boiler back on with the On/Off
switch.