![eta BE-P3 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/eta/be-p3/be-p3_installation-manual_2430221011.webp)
Installation
Exchange for HACK, SH, PE-K
11
If the cut-out has been enlarged, the tabs are left
on the retaining plate.
Fig. 3-17: Attachment (enlarged cut-out)
Plug the USB cable already mounted on the cover into
the side of the control panel.
Fig. 3-18: USB cable
Connect the USB adapter cable (part of delivery
scope) to the control panel and the existing boiler USB
cable. If a network cable was previously connected,
also connect it to the control panel.
Fig. 3-19: USB adapter cable
Attach the USB cable from the boiler to the door
frame with a cable tie. So that the plug does not
hit the panel when opening and closing the insulation
door.
Reassembling the insulation door
Connect the earthing cable of the cover to the
insulation door terminal.
Fig. 3-20: Earthing
Thread-in the handle bar and re-attach the cover to the
insulation door. Mount the cover plate on the inside
again.
Содержание BE-P3
Страница 19: ......
Страница 20: ...www eta co at www eta co at downloads DOWNLOAD...