Installation
Mounting the heat exchanger cleaner
17
Mill out the flame pipe of the pellet burner and the
insulating plate with a drill and a 10 mm drill bit. Start
at the bottom of the opening and slowly mill out the
hole clockwise.
Fig. 4-17: Mill the insulating plate
Remove dust and dirt from the seal and the
combustion chamber.
Adjusting the combustion chamber refractory
lining
The refractory lining in the combustion chamber is
already pre-milled. Strike through the visible lining in
the opening with a hammer shaft.
Fig. 4-18: Refractory lining
Remove the piece of lining that has been broken off
from the combustion chamber.
4.2
Mounting the heat exchanger
cleaner
Remove the insulation around the heat exchanger
cleaning
Remove the insulation of the boiler on which place
heat exchanger cleaning will be mounted. The
insulation is already perforated in this area.
Mounting the heat exchanger cleaner
Press the lever shaft into the turbulator linkage and
secure with the bolt. The lever must point to the back
side of the boiler.
Fig. 4-19: Lever shaft
Содержание 11120L
Страница 1: ...2020 07 21 EN 0000000371 V 012 2503 939023 004 TWIN pellet burner 40 50 kW Installation...
Страница 7: ...General Dismantling disposal 7...
Страница 27: ...Installation Network connection 27...
Страница 47: ......
Страница 48: ...www eta co at www eta co at downloads DOWNLOAD...