background image

www.etsolar.hk 

- 11 - 

modules.  This  technique  can  be  applied  as  long  as  the  method  is  efficient 
enough to clean the modules considering the on-site conditions.   
 

Method C: Wet cleaning

   

 

If excessive soiling is present on the module surface, a non-conductive brush, 
sponge, or other mild agitating method may be used with caution.   

 

Please make sure that any brushes or agitating tools are constructed with non-
conductive materials to minimize risk of electric shock and that they are not 
abrasive to the glass or the aluminum frame.   

 

If grease is present, an environmentally friendly cleaning agent may be used 
with caution.   
 

Method D: Cleaning robot   

 

If a cleaning robot is used for dry cleaning, the brush material is required to be 
soft plastic material, and the glass surface and aluminum alloy frame of the 
module will not be scratched during the cleaning process and after cleaning. 
The weight of the cleaning robot should not to be too large. If the cleaning 
robot  is  improperly  used,  and  the  resulting  module  damage  and  power 
attenuation are not covered by ET Solar’s warranty.   
 

TROUBLE SHOOTING   

 

If your PV system does not work normally after installation, please inform your 
installer  immediately.  It  is  recommended  to  perform  preventive  inspections 
every six months, and do not change the components of the modules without 
authorization.  If  electrical  or  mechanical  performance  inspection  or 
maintenance is required, they should be operated by qualified professionals to 
avoid any electric shock or personal injury.   

 
6.2 The visual inspection of the modules 

Inspect the modules visually to find if there are appearance defects, especially: 

 

whether the module glass is broken.   

 

If there is burning vestige on the backsheet. 

 

Corrosion along the cells’ bus-bar. The corrosion is caused by the dampness 
infiltrated  into  the  modules  when  the  surface  encapsulation  material  is 
damaged during the installation or transportation. 

 

Check if any obstacles shading the PV modules 

 

6.3 Inspection of the connector and cable 

It is suggested to carry out the following preventive inspection every 6 months.   

 

Check the encapsulation of the connector with the cable 

 

Check the sealing gel of the junction box to ensure it is not cracked or creviced. 

7

 

Disclaimer of liability 

Содержание ET-M660BH GL Series

Страница 1: ...www etsolar hk INSTALLATION MANUAL ET Solar Series Module Installation Safety instructions Maintenance Version 2021Q4...

Страница 2: ...Selecting the proper mounting structure and hardware 4 4 2 Mounting methods 4 4 2 1 Mounting with bolts 4 4 2 2 Mounting with clamping hardware 5 4 2 3 Installation position and static loads 6 5 Elec...

Страница 3: ...ompliance with this installation instruction may result in property damage and or physical injury ET Solar will not be liable for compensation of any loss or injury caused by this type of non complian...

Страница 4: ...re may go outside the above range please consult with ET Solar before installation The irradiance reflected on the rear of the bifacial solar modules shall not exceed 300W m2 Do not attempt to disasse...

Страница 5: ...y a factor of 1 25 when determining component voltage ratings conductor ampacity fuse sizes and size of controls connected to the module or system output An additional multiplying factor of 125 percen...

Страница 6: ...r to standard solar photovoltaic installation guides or a reputable solar installer or systems integrator Shading on the module will reduce electricity production Do not install the module near equipm...

Страница 7: ...big enough to fix the modules steadily Please find detailed mounting information in the below figure A 1 2 4 2 2 Mounting with clamping hardware When choosing clamp mounting method please be sure to u...

Страница 8: ...ion and static loads Maximum design load of the PV module by front 3600pa and back1600pa the safety factor of 1 5 times these values can vary depending on installation method of the modules please ref...

Страница 9: ...ET Solar recommends the negative pole of PV module array is connected to earth during all PV system installations That will keep optimal performance of PV Power Plants which are located in a hot high...

Страница 10: ...if hot spot occurred the diode will come into operation to stop the main current from flowing through the hot spot cells in order to prevent module over heated and performance loss Notice bypass diod...

Страница 11: ...keep PV modules clean The dirt such as bird droppings leaves dust is usually need to be cleaned When cleaning the modules make sure that the temperature difference between the water and the module is...

Страница 12: ...as lubricants and organic solvents to clean the connectors Do not clean modules under the weather conditions of wind more than 4 class in Beaufort scale heavy rain or heavy snow When cleaning the modu...

Страница 13: ...uation are not covered by ET Solar s warranty TROUBLE SHOOTING If your PV system does not work normally after installation please inform your installer immediately It is recommended to perform prevent...

Страница 14: ...ssumed by ET Solar for any infringement of patents or other rights of third parties which may result from use of the PV product No license is granted by implication or otherwise under any patent or pa...

Страница 15: ...www etsolar hk 13 Appendix 1 Electrical ratings of ET Solar modules Sheet 1 solar cell type 166mm...

Страница 16: ...www etsolar hk 14 Sheet 2 solar cell type 158 75mm...

Страница 17: ...www etsolar hk 15 Sheet 3 solar cell type 156 75mm mono si poly si Sheet 4 solar cell type 182mm...

Страница 18: ...www etsolar hk 16...

Страница 19: ...ABOUT MANUFACTURER ET SOLAR POWER HONGKONG LIMITED Room 01 21 F XINGFA Commercial Building 9th Tobacco Factory Street Mong Kok HongKong Tel 86 510 85382358 Fax 86 510 85382358 mail support etsolar HK...

Отзывы: