Esse O-106 Скачать руководство пользователя страница 5

9

Once burner is firing check and if necessary adjust oil pressure. (see Technical Data).

Carry out combustion checks by inserting probe into sampling point provided at the flue box behind the

cast iron flue hood access door. (Fig. 8) The air setting is pre-set.

Check the smoke number and if necessary increase the air setting progressively until a number between

0 and 1 is achieved.

Note:

From cold and particularly on a new installation, there will be a condensation of the flue gases

and this may affect the paper

Allow boiler to heat up for a further 10 minutes then check smoke number, adjusting the air if necessary

(see Technical Data). Monitor the flue draught at the same point and check that a steady updraught is obtained.

Turn boiler thermostat to ‘O’. Isolate mains supply and remove the pressure gauge.

Cooker Burner (Right Hand Burner)

Connect combined air bleed manifold and pressure gauge to pump.

Re-establish electricity supply to the cooker.

Warning:

The cooker power is now live. Extreme caution must be exercised.

Check that any ancillary controls e.g. programmer etc are in an ON position.

Turn cooker thermostat to 250°C position. Burner should start ignition sequence.

(When the burner motor starts on a one pipe system it may be necessary to temporarily open the air bleed

screen on test manifold).

Once burner is firing check and if necessary adjust oil pressure (see Technical Data).

Carry out combustion checks by inserting probe into sampling point provided at the flue box. (Fig. 8)

The air setting is pre-set at minimum.

Check the smoke number and if necessary increase the air setting progressively until a number between

0 and 1 is achieved.

Note:

From cold and particularly on a new installation, there will be a condensation of the flue gases

and this may affect the paper.

Allow cooker to heat for a further 10 minutes then check smoke number, adjusting the air setting if

necessary (see Technical Data). Monitor the draught at the same point and check that a steady updraught

is obtained.

Turn cooker thermostat to OFF. Isolate mains supply, remove pressure gauge and replace the control panel.

To complete the commissioning process, you must fill in both of the following:

a) Commissioning Record - at the back of this booklet on p18

b) Commissioning Confirmation Form - a separate leaflet supplied with this cooker.

Important:

Failure to complete these documents will invalidate the warranty of this product.

8

Infil plate

Door pin

Control

panel

Upper

control

panel

securing

screw

Wiring panel securing

screws

WIRING PANEL

Lower control panel securing screw

AllAn

Screw

Oil Installation Schematic Diagram - Fig.3

vent

filler

drain valve

remote operated

fire valve

shut-off valve

oil tank

isolating valve

filter

cooker

10ft (3m) max head of oil

18” (475mm)

min head of oil

Removing the Wiring Panel - Fig.2b

Removing the Control Panel - Fig.2a

Содержание O-106

Страница 1: ...lame Tube BFB 01 002 002 01 01 1001 D 0 60 BURNER Nozzle 0 6 x 80ES 2021 254 Flame Tube BFB 01 104 01 01 1010 2 COOKER BURNER Nozzle Danfoss 0 3 x 80 H or Delavan 02 02 1150 0 3 80 A Flame Tube BFB 01...

Страница 2: ...0 1 O 60 OC 36 000 Btu h 80 A or H 87 1 notch 4 5 O 106 170 4 41 O 80 130 3 62 O 60 100 2 96 MODEL AIR SUPPLY MIN TOTAL FUEL CONSUMP CM 2 l h MODEL OUTPUT INPUT Nozzle Pressure Fuel Air C02 Soot No kW...

Страница 3: ...e fitted to the programmer Commission the programmer as described in figs 3a 3b Typical systems are shown in Figs 4 5 5A 6 6A The water system and the electrical wiring system used must be in accordan...

Страница 4: ...em can allow the boiler and pump to operate on bypass only the bypass must be placed at least 1 5m 5 3 away from the boiler Inhibitor Attention is drawn to the current issue of BS5449 and BS 7593 on t...

Страница 5: ...is firing check and if necessary adjust oil pressure see Technical Data Carry out combustion checks by inserting probe into sampling point provided at the flue box Fig 8 The air setting is pre set at...

Страница 6: ...CentaurPlus controls are fitted with battery reserve which maintains programmed times in the event of a mains power failure Battery Reserve The battery must be commissioned prior to fitting the contr...

Страница 7: ...L Boiler stat Boiler burner Cooker programmer Cylinder stat L641A or equivalent DHWS Cylinder primary motorised valve 28mm V4043H or equivalent Heating circuit motorised valve V4043H or equivalent Roo...

Страница 8: ...1 L N E HORSTMANN C17 Model OC COOKER ONLY Fig 6a Boiler stat Boiler burner Cooker programmer Cylinder stat L641A or equivalent DHWS Cylinder primary motorised valve 28mm V4043H or equivalent Heating...

Страница 9: ...nce overheat device has operated Control relay or photo cell defective Burner fails to start Lamp not lit Oil not being delivered Excess flue draught is preventing flame establishment No spark Burner...

Страница 10: ...Tel No Fax No OFTEC Reg No Engineers Name Date Address Tel No Fax No OFTEC Reg No Engineers Name Date Address Tel No Fax No OFTEC Reg No 18 Engineers Name Date Address Tel No Fax No OFTEC Reg No Engin...

Отзывы: