COMMISSIONING

i) Remove both upper & lower locking grub screws from hinges using the 3/16” allan key provided.

ii) Using the same allan key, adjust either or both eccentric pins in each door hinge to level the door.

iii) Once the door is level, lock the eccentric pins in place using the locking grub screws.

Door

SIZES ARE APPROXIMATE ONLY. VARIATIONS MAY OCCUR IN MANUFACTURE.

3/16” Allan Key

Door Hinge

Eccentric

pin

Locking
grub screw

INSTALLATION

The cooker is supplied with the air intake at the front. If required the air intake can be taken from the rear

as follows:- (Fig. 7)

i) Remove the kicker plate securing screws.

ii) Remove the blanking plate located at the rear right-hand corner of the base. Fix the blanking plate over

the front primary air intake at the front right hand corner of the base.

iii) Replace the kicker plate.

Move the cooker into position. Connect water flow and return pipes. Remove left-hand panel and connect

oil supply. Fit electrical cables to the chosen system. Replace left-hand side panel. Fit the flue box. Make

the flue connection.

Fit the flue box sealing plate and gasket. Fit the flue box door (Fig. 8)

Fit the towel rail using the towel rail brackets supplied.

The baffle arrangement above the boiler heat exchanger need not be disturbed on installation.

If however, they have been removed for any reason, then they must only be replaced as shown in Fig. 9.

DOOR HINGE ADJUSTMENTS

Bypass

A bypass should be fitted. Where the water system can allow the boiler and pump to operate on bypass

only, the bypass must be placed at least 1.5m (5’3”) away from the boiler.

Inhibitor

Attention is drawn to the current issue of BS5449 and BS 7593 on the use of inhibitors in central heating

systems. If an inhibitor is to be used, contact an inhibitor manufacturer for their recommendations as to

the best product to use.

The water system and the electrical wiring system used must be in accordance with current regulations.

This appliance is fitted with two oil pressure jet type burners and must be commissioned by an

experienced pressure jet engineer (OFTEC) with the necessary equipment available for setting up the

burner and checking that combustion characteristics and chimney draught comply with those detailed in

the text.

Failure to comply will lead to incorrect operation, nuisance shutdown, equipment failure or damage to

appliance. GUARANTEE will be invalidated if the appliance is not correctly commissioned.

Procedure

Important:

Ensure the mains supply is isolated and that both thermostats are at the off position.

Remove control panel.

Check the oil and water connections for soundness.

Boiler Burner (Left Hand Burner)

Connect combined air bleed manifold and pressure gauge to pump.

Re-establish the electricity supply to the cooker.

Warning:

The power is now live. Extreme caution must be exercised.

Check that any ancillary controls e.g. room thermostat, programmer etc., are in an ON position.

Turn boiler thermostat to 80°C position. Burner should start ignition sequence.

(When the burner motor starts on a one pipe system it may be necessary to temporarily open the air bleed

screw on test manifold).

Содержание O-106

Страница 1: ...lame Tube BFB 01 002 002 01 01 1001 D 0 60 BURNER Nozzle 0 6 x 80ES 2021 254 Flame Tube BFB 01 104 01 01 1010 2 COOKER BURNER Nozzle Danfoss 0 3 x 80 H or Delavan 02 02 1150 0 3 80 A Flame Tube BFB 01...

Страница 2: ...0 1 O 60 OC 36 000 Btu h 80 A or H 87 1 notch 4 5 O 106 170 4 41 O 80 130 3 62 O 60 100 2 96 MODEL AIR SUPPLY MIN TOTAL FUEL CONSUMP CM 2 l h MODEL OUTPUT INPUT Nozzle Pressure Fuel Air C02 Soot No kW...

Страница 3: ...e fitted to the programmer Commission the programmer as described in figs 3a 3b Typical systems are shown in Figs 4 5 5A 6 6A The water system and the electrical wiring system used must be in accordan...

Страница 4: ...em can allow the boiler and pump to operate on bypass only the bypass must be placed at least 1 5m 5 3 away from the boiler Inhibitor Attention is drawn to the current issue of BS5449 and BS 7593 on t...

Страница 5: ...is firing check and if necessary adjust oil pressure see Technical Data Carry out combustion checks by inserting probe into sampling point provided at the flue box Fig 8 The air setting is pre set at...

Страница 6: ...CentaurPlus controls are fitted with battery reserve which maintains programmed times in the event of a mains power failure Battery Reserve The battery must be commissioned prior to fitting the contr...

Страница 7: ...L Boiler stat Boiler burner Cooker programmer Cylinder stat L641A or equivalent DHWS Cylinder primary motorised valve 28mm V4043H or equivalent Heating circuit motorised valve V4043H or equivalent Roo...

Страница 8: ...1 L N E HORSTMANN C17 Model OC COOKER ONLY Fig 6a Boiler stat Boiler burner Cooker programmer Cylinder stat L641A or equivalent DHWS Cylinder primary motorised valve 28mm V4043H or equivalent Heating...

Страница 9: ...nce overheat device has operated Control relay or photo cell defective Burner fails to start Lamp not lit Oil not being delivered Excess flue draught is preventing flame establishment No spark Burner...

Страница 10: ...Tel No Fax No OFTEC Reg No Engineers Name Date Address Tel No Fax No OFTEC Reg No Engineers Name Date Address Tel No Fax No OFTEC Reg No 18 Engineers Name Date Address Tel No Fax No OFTEC Reg No Engin...

Отзывы: