12
Kongsberg XN / iPC 2.0
85
The suction tube is fixed to the suction house.
When
MultiCUT-HP
is not in use, the suction
tube and the water tubes are fixed to the
traverse as shown here.
Chiller / MultiCUT-HP start up time
Depending upon the environmental temperature, the
Chiller
needs some start-up time after
Power On
before it is ready to operate.
Typical delay is 2 – 3 minutes.
Suction house, adjustable height
On
MultiCUT-HP
, you can lock the suction house in any height; still, it is allowed to move
upwards.
This function is useful in order to
1.
Adapt to different material thicknesses.
2.
Allow false air input in order to reduce suction force.