
7
Kongsberg XL
7. Basic Operations
Keep away from
Moving Parts
during operation.
Do not lean on
Racks
,
Guide Ways
or
Traverse
during operation, as this may
cause personal injury.
Before starting any operation, make sure that:
• The Table is free from obstructions
• No unauthorized personnel come close to the table
7.1. Power On Sequence
Ensure the table is free from obstructions and ready for operation.
Follow these steps to power up the system and get ready to work:
1
Front End PC
Switch on the PC and the monitor.
2
Table Power
Switch the table on using the
Main Power Switch
.
Note: After power off, wait minimum 5 sec. before the system is
switched on again.
3
iPC
From Desktop, double-click the icon for
iPC
Check that no error message indicates faulty conditions.
4
Safety System
Reset the
Safety System
by pressing the
Pause
pushbutton.
5
Servo Power
Press the
Servo On
pushbutton.
The
Warning Lamp
on top of the Y carriage should be constantly lit.
Any malfuction of the lamp must be corrected as soon as possible since
this is a safety feature.
29
Содержание Kongsberg XL
Страница 1: ...Kongsberg XL User Manual 09 2020 XL ...
Страница 46: ...9 Kongsberg XL For more information go here 46 ...
Страница 54: ...10 Kongsberg XL 10 13 Board Size Not implemented yet 54 ...
Страница 149: ...13 Kongsberg XL Note On XL this tool will reduce the work area by approximate 25 mm 1 in in some axes 149 ...
Страница 162: ...16 Kongsberg XL 5 Lift and turn the container to release it from the fixture 6 Empty the container 162 ...