- 9 -
STEP 3:
Install
P6R
and
P5L
into
P1L
and
P2R
as shown in
FIGURE 3
.
Please double check “Goalrilla” logo is facing “outside” on both
P6R
and
P5L
. Attach using hardware as shown in
FIGURE 3
.
Install both
P7B
’s onto
P5L
and
P6R
. Attach using hardware as shown in
FIGURE 3
. Tighten all hardware.
IMPORTANT NOTE: INSTALL ALL BOLTS IN SAME DIRECTION AS PER ALL DIAGRAMS.
4 pcs -
H1
20mm Allen Head Bolt
4 pcs -
H2
40mm Allen Head Bolt
8 pcs -
H5
Flat Washer
8 pcs -
H6
Lock Washer
4 pcs -
H7
Locknut
1 pc -
P5L
Top Left Side Support Beam
1 pc -
P6R
Top Right Side Support Beam
2 pcs -
P7B
Goal Net Support Beam
PARTS REQUIRED:
H1
H6
H5
H7
H6
H5
H1
H6
H5
H7
H6
H5
H2
H2
H2
H2
H1
H6
H5
H7
H6
H5
H7
H6
H5
H1
H6
H5
P6R
P5L
NOTE:
“Goalrilla”
Logo
facing
out.
NOTE:
Double check to insure
“G” logo is facing down.
P7B
P7B
P2R
P1L
FIGURE 3
1 pc -
T1
Allen Wrench
1 pc - Rubber Mallet
1 pc - 1/2” or 13mm End Wrench