MyLab
- G E T T I N G S T A R T E D
4 - 1
Chapter
4
GETTI
NG STARTED
4. Preparing for use
MyLab
will be installed by Esaote personnel. Esaote personnel will be
responsible for opening the packaging and ensuring that the device is
correctly programmed and operational.
The information and procedure provided in this chapter will guide to prepare
MyLab
for use. Preparation includes connecting probes and external devices,
locking articulated components for moving, and ensuring that device
operating is met.
Acclimation Time
If the device has been exposed to temperatures which are outside the range
given for its correct working (15÷35°C), it must acclimate, before being
switched on. The following table indicates the necessary waiting times.
Table 4-1: Acclimation Time
Connecting MyLab to a Network
To use connectivity features, the device must be connected to a network.
The LAN plug is placed at the bottom of the rear side; it supports Gigabit,
10Base-T, and 100Base-T Ethernet LAN. An Esaote field engineer or your
network administrator must configure
MyLab
for network connectivity.
1. Turn off
MyLab
power.
2. Connect one end of the provided network connection cable
to the wall plug for your network.
3. Connect the other end of the cable to the network plug on
MyLab
.
4. Turn
MyLab
on.
T(C°)
60
55
50
45
40
35÷15
10
5
0
-5
-10
-15
-20
Hours
8
6
4
2
1
0
1
2
4
6
8
10
12
Содержание MyLabX75VET
Страница 1: ...Rev 03 June 2021 MyLabX75VET GETTING STARTED 350080800 ...
Страница 2: ......
Страница 5: ...MyLab G E T T I N G S T A R T E D v GETTING STARTED RED Declaration of Conformity ...
Страница 6: ...MyLab G E T T I N G S T A R T E D vi ...
Страница 61: ...S Y S T E M O V E R V I E W MyLab G E T T I N G S T A R T E D 3 17 GETTING STARTED ...