
5 OPERATION
0463 618 001
- 33 -
© ESAB AB 2019
Figure 5. Plotting duty cycle for 230 V, 1ph AC
Figure 6. Plotting duty cycle for 460 V or 575 V, 3ph AC
5.7
Removing/installing bobbin
NOTE!
The gas need not be connected for this procedure.
Power should be turned off for
this procedure.
The spring sets the “braking value” working against the wire-feed motor and the pull of the
roller-feed wheels. Tighten the bolt “A”, see illustrations below, hand tight.
Remove/Install the bobbin as shown in below.
Tightening the bobbin locking nut for 100 mm (4 in.):
Содержание EMP 285ic 1ph
Страница 27: ...5 OPERATION 0463 618 001 27 ESAB AB 2019 5 5 1 2 SMAW Stick 230 V 1ph 5 5 1 3 GMAW MIG 120 V 1ph ...
Страница 28: ...5 OPERATION 0463 618 001 28 ESAB AB 2019 5 5 1 4 GMAW MIG 230 V 1ph 5 5 1 5 GTAW TIG 120 V 1ph ...
Страница 77: ...ROLLER WIRE GUIDE SELECTION 0463 618 001 77 ESAB AB 2019 ...