CutSkill 60
OPERATING MANUAL
OPERATION 4-2 0-5574
C. Check Primary Input Power Source
1. Check the power source for proper input voltage. Make sure the input power source meets the power
requirements for the unit per Specifications in Section 2.
2. Connect the input power cable (or close the main disconnect switch) to supply power to the system.
240V AC Power Source
A-13886
Note: For maximum duty cycle to be achieved,
Supply Plug and Lead must be upgraed to
4mm Supply Lead & 20A Supply Plug.
Refer to Specification Table on Page 2-1.
2
Figure 4-2: Connecting Power Cable
D. Gas Selection
Ensure gas source meets requirements listed in Section 2T. Check connections and turn gas supply on.
E. Connect Work Cable
Clamp the work cable to the workpiece or cutting table. The area must be free from oil, paint and rust. Con-
nect only to the main part of the workpiece; do not connect to the part to be cut off.
Art # A-03387
Figure 4-3: Connecting Work Cable
Содержание 1-1601-60
Страница 8: ...This Page Intentionally Blank...
Страница 12: ...CutSkill 60 OPERATING MANUAL GENERAL INFORMATION 1 4 0 5574 This Page Intentionally Blank...
Страница 38: ...CutSkill 60 OPERATING MANUAL OPERATION 4 8 0 5574 This Page Intentionally Blank...
Страница 42: ...CutSkill 60 OPERATING MANUAL SERVICE 5 4 0 5574 This Page Intentionally Blank...
Страница 45: ...CutSkill 60 OPERATING MANUAL 0 5574 A 1 APPENDIX APPENDIX 1 CIRCUIT DIAGRAM PLASMA CUTTER 60120 460...
Страница 46: ...This Page Intentionally Blank...
Страница 49: ...CutSkill 60 OPERATING MANUAL This Page Intentionally Blank...