Instalacion_240.fm -
21/2/13
INSTALLATION
54
Installation Manual
Loosen the discharge screw
Mount the gland and introduce the cable
1
Introduce the cable (3) through the gland PG11 (1).
2
Position the gland in the cover (4) and attach using
the PG11 nut (2).
P240H
CAUTION. VERY IMPORTANT:
Once the operator is mounted on the
supports, turn the discharge screw (1) once to
allow the correct operation of the hydraulic
system.
O
If you have to dismount the operator from its
supports, first tighten the discharge screw in
order to prevent the hydraulic fluid from
leaking.
P188F
Содержание VULCAN D VUA12
Страница 2: ......
Страница 24: ...Actualizado 22 1 13 MANTENIMIENTO Y DIAGNÓSTICO DE AVERÍAS 20 Manual de instalación ...
Страница 44: ...Mis à jour 25 2 13 MAINTENANCE ET DIAGNOSTIC DE PANNES 40 Manuel d installation ...
Страница 64: ...Updated 21 2 13 MAINTENANCE AND DIAGNOSIS OF FAILURES 60 Installation Manual ...
Страница 84: ...Actualizado 21 2 13 MANUTENÇÃO E DIAGNÓSTICO DE AVARIAS 80 Manual de instalação ...