Installing the BelAir20EO and AP 511x Series AP
Figure 3
Power Connections for AP 5115 to AP 5118
Note:
Ground wire and mounting hardware not shown.
2.6
Step 6—Check Indicators
After powering on, wait 2 minutes and check the indicators on the unit.
If the indicators are not as shown, refer to the
BelAir20EO and AP 511x Series
Technical Description
,
1/1550-LZA 101 803
.
2.7
Step 7—Configure Unit
In most cases, the unit configures itself automatically after powering on. To
configure the unit manually through its local web interface or Command Line
Interface (CLI), refer to the
Access Point User Guide
,
1/1553-LZA 101 806
.
14
1/006 92-LZA 101 803 Uen D
|
2013-12-13