Ergo EMPRO-WM175B Скачать руководство пользователя страница 3

Installation

The following steps must be performed by two 
people.

Determine  the desired viewing location. Use a stud 
fi nder to locate two studs closest to the viewing 
location.

Once the studs have been located, use a pencil to 
mark the centre of each stud.
NB. A minimum of two (2) wall studs must be used in 
the installation of this product.

When determining viewing height, the centre of 
the TV should be at eye level while sitting in an 
upright position. When using the fl at panel as room 
decoration, raise it to the point where the bottom of 
the screen is at eye level while sitting and the top is 
eye level when standing.

Drill a pilot hole at the marked location using a 
power drill and 1/4” drill bit.

NB. 

Only use 1/4” drill bit when drilling the pilot 

holes.

Two people must perform the installation. One 
person must hold the mount whilst the other person 
levels the mount. The mount must remain in place 
while the mounting hardware is tightened .

Level the mount.
Align the mounting slot with the drilled hole.
Insert and tighten one 5/16” x 3” lag bolt and fl at 
washer. Tighten using a 1/2” socket wrench. Do not 
completely tighten the lag bolt at this time.

NB.

 Do not overtighten lag bolts when attaching the 

mount to the wall. Improper installation may result 
in personal injury or damage to property.

1

2

3

Wood Stud Installation

1

2

3

Electronic Stud
Finder

Wall Stud

4

5

6

1/2” Socket Wrench

5/16” Lag Bolt

Flat Washer

Mounting Slot

Upper Mounting Channel

Wall Stud

1/4” Drill Bit

3

Содержание EMPRO-WM175B

Страница 1: ...EMPRO WM175B Flat Panel Swing Out Arm...

Страница 2: ...Adaptors Qty 4 5 16 x 3 Lag Bolts Qty 6 5 16 FlatWashers Qty 6 Griplate Qty 6 Thread Depth Indicator Qty 1 Universal Spacers Qty 24 Channel Covers Qty 6 M8 Nylon Nut Qty 4 5 16 FlatWashers Qty 4 Inst...

Страница 3: ...at the marked location using a power drill and 1 4 drill bit NB Only use 1 4 drill bit when drilling the pilot holes Two people must perform the installation One person must hold the mount whilst the...

Страница 4: ...roper installation may result in personal injusry or damage to property NB A minimum of two wall studs must be used in the installation of this product Repeat these steps to secure the lower mounting...

Страница 5: ...el when standing Next drill holes using a masonry bit for your anchors Insert a commercially available concrete anchor into each hole Use a hammer and lightly tap each anchor into place so that only t...

Страница 6: ...crews provided The correct screws should thread easily into the mounting point and not pull out when tension is applied NB You must account for the bracket spacers and Griplate depths when using the T...

Страница 7: ...B The number and location of mounting points will vary between manufacturers Do not over tighten the screws Place your flat panel screen down on a soft flat surface and locate the threaded mounting po...

Страница 8: ...screwdriver insert and tighten the mounting hardware and adaptor plates to the back of the flat panel Do not overtighten the screws Place the universal mounting brackets over the threaded mounting stu...

Страница 9: ...n the top of the mounting brackets Once the flat panel is level use a screwdriver to tighten the two M6 x 30 locking screws located on the bottom of the mounting brackets Do not over tighten these scr...

Страница 10: ...while the lower hand gently pulls the bottom of the flat panel away from the wall Plastic Channel Cover Installation Place the plastic channel covers over the mounting plate 2 side covers and 1 centr...

Страница 11: ...33 21 843 25 71 653 26 43 671 34 31 871 14 02 356 3 21 82 16 00 407 Technical Specifi cations 11...

Страница 12: ...ErgoMounts Limited Unit 10 Pegasus Court North Lane Aldershot Hampshire GU12 4QP T 44 0 1252 333326 F 44 0 1252 330006 www ergomounts co uk ErgoMounts v1 022013 See it your way...

Отзывы: