
Maintenance 10. Ball Screw Spline Unit
G10 / G20 Rev.20
209
(15) Install the end effector, and connect wires and tubes to the end effector.
(16) This step is only for Cleanroom-model and Protected-model (C, D with bellows
option, P).
Install the bellows.
For details, refer to
Maintenance: 9. Bellows
.
(17) Perform the calibration of Joints #3 and #4.
For details, refer to
Maintenance: 14. Calibration
.
Содержание G10 Series
Страница 1: ...Rev 20 EM183R3619F SCARA ROBOT G10 G20 series MANIPULATOR MANUAL ...
Страница 2: ...MANIPULATOR MANUAL G10 G20 series Rev 20 ...
Страница 8: ...vi G10 G20 Rev 20 ...
Страница 14: ......
Страница 102: ...Setup Operation 5 Motion Range 90 G10 G20 Rev 20 ...
Страница 103: ...Maintenance This volume contains maintenance procedures with safety precautions for G10 G20 series Manipulators ...
Страница 104: ......