
EPL-N2700 Optional Units
Revision A
10-Bin Unit
Disassembly and Assembly of the 10-Bin Unit
127
5.2.2.15 Transport Roller Removal
1. Remove the outer covers. (See Section 5.2.1.)
2. Remove the Sort/Non-Sort Switch Solenoid. (See Section 5.2.2.5.)
3. Release the cable from the cable clamp in the guide plate.
4. Remove the Sort/Non-Sort Switch Guide. (See Section 5.2.2.14.)
5. Remove the E-ring (9125) securing the axle plate to the Transport
Roller, then remove the axle plate, two bushings, and the gear 20T.
6. Remove the E-ring (9125) securing the gear 17T to the Transport
Roller.
7. Unlock the gear 17T by the inside and remove it from the Transport
Roller.
8. Remove the E-ring (9124) securing the gear 17T to the 10-Bin Unit
frame shaft and remove the gear.
9. Remove the gear 37T from the 10-Bin Unit frame.
10. Remove four screws (3508) securing the guide frame to the front
and rear sides of the 10-Bin Unit frame, and remove the Guide
Plate.
11. Remove two E-rings (9125) from the both ends of the roller.
12. Remove the Transport Roller along with the ball bearing.
13. Remove the bearing from the Transport Roller.
Figure 5-41. Transport Roller Removal
Содержание EPL N2700
Страница 1: ...EPSONEPL N2700OptionalUnits SEPG98007 ...
Страница 4: ...Revision Status Revision Issued Date Description A Fuburary 10 1999 Revision A ...
Страница 8: ... DOUBLECASSETTEUNIT ...
Страница 23: ... DUPLEXUNIT ...
Страница 34: ... LCCUNIT ...
Страница 75: ... 5 BINUNIT ...
Страница 106: ... 10 BINUNIT ...
Страница 161: ... OPERATINGPRINCIPLES ...