![EOS Zeus HD Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/eos/zeus-hd/zeus-hd_installation-and-operating-instructions-manual_2416963018.webp)
EN-18
Installation and Operating Instructions - EOS Zeus HD / Zeus L HD
Installation
EN
Air supply from below
The air inlet must meet the following criteria:
Location: centred below the heater.
Dimensions: Ø depending on heater output 250–300 mm,
see 2.4 Technical data,
The air supply volume per hour must equal 5 times the cabin volume.
Installing the air inlet in the cabin floor
This form of air supply requires that the slats on the bottom of the heater
are bent upward. See
The slots are bent upward during heater manufacturing. They must be
checked before commissioning.
A
Air supply through cabin floor
B
Slats open
~790 mm
B
A