![EOS Zeus HD Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/eos/zeus-hd/zeus-hd_installation-and-operating-instructions-manual_2416963041.webp)
EOS Zeus HD / Zeus L HD - Installation and Operating Instructions
EN-41
Maintenance
Replacing the tubular heating elements
1
Remove the heating coil.
See
2
Loosen the 8 crosshead screws on the cover and side panel of the termi-
nal box (
C
).
3
Remove the cover and side panel of the terminal box.
4
Unscrew the nuts (
B
) and remove the copper strip (
E
).
5
Identify the defective tubular heating element by taking measurements.
6
Loosen the nuts (
D
) from the defective tubular heating element on the
top panel of the terminal box (
A
).
The tubular heating elements are mounted on the top panel of the
terminal box (
A
) and fixed from below with nuts and serrated wash-
ers.
7
Remove the tubular heating elements.
8
Insert the new tubular heating elements and screw on the nuts.
A
Top panel of terminal box
B
Nut (M4) for copper strip
C
Side panel of terminal box
D
Nut (SW22) for tubular heating element
E
Copper strip
C
E
B
A
D