32
Installation and Operating Instructions - MEGA
Commissioning
EN
Commissioning
Before the heater can be commissioned, it must be filled with sauna stones,
which are available as optional accessories.
The heater switches on together with the relay boxes. It is operated via the
control panel. Before commissioning the heater, ensure that the air inlets
are free of lint. Remove any lint with a moist towel.
WARNING
Fire hazard
Objects placed on the heater could catch fire. Herbs placed on the
heater could catch fire.
Inspect the cabin prior to each use.
When preparing the infusion water, follow the instructions re-
garding quantity as specified on the infusion concentrate con-
tainers.
Do not use pure concentrate for infusions.
Do not use alcohol for infusions.
Pour the infusion water over the stones only.
Air inlets and outlets must remain open.
Commission the heater only if it has been filled with stones (see