AFTER INSTALLING THIS UNIT PLEASE PASS ONTO END USER
DO NOT THROW AWAY
SECOND FIX -
Connect 22mm PVC drain fitting
4. The drainage from the unit may be
connected to an internal waste water
system or soil pipe with an appropriate
non-return device. One way valve device
is recommended. Insulate pipes in an
unheated loft space.
Floor mounting
5. The unit can be floor mounted in a
loft space with an additional drainage
kit. EnviroVent Part number KIT-
CONDENSATE-ES250-2. Use the long
and short S brackets provided along
with short fitting screws to ensure correct
drainage. The unit must be higher at the
duct end.
Drain connections should be solvent welded
as here. The centre Tee section is reversed
to make either LH or RH drain. Push in the
drain fitting and seal as appropriate to create
a watertight assembly
.
Important note: The floor mounted drain
must be fitted on the same side as the
factory fitted drain. This unit is for wall or
floor mount only. Ceiling mounting unit are
configured differently and should be ordered
separately.
10
05
Installation Instructions
RH
LH
Foam casing