13
RAIN CAP. ENSURE CAP IS A LEAST
3 FEET ABOVE THE ROOF AT THE
LOWEST POINT.
ROOF FLASHING
ROOF RAFTER
FIRE STOP with SUPPORT COLLAR
CEILING JOIST
VERTICAL VENT PIPE
CLEAN OUT TEE with PIPE ADAPTER
EF V EVOLUTION
NOTE:
ALL VENT SECTIONS MUST
MAINTAIN 3 “ INCHES (7.62 CM)
CLEARANCES TO COMBUSTIBLES.
VERTICAL INSTALLATION
1.
Choose a stove location that is ideal. See the section Deciding Where to Locate Your Pellet Appliance.
2.
Place the unit on the hearth pad (if installed on a carpeted surface.) and space the unit in a manner so
when the pellet vent is installed vertically, it will be 3” (76 mm) away from a combustible wall.
3.
Locate the center of the fresh air intake pipe on the unit. Match that center with the same point on the
wall and cut a hole about 2 1/8 (53.9 mm) in diameter.
4.
Install the fresh air intake pipe.
5.
Install the tee with clean out.
6.
Install the pellet vent upward from there. When you reach the ceiling make sure that the vent goes
through the ceiling fire stop. Maintain a 3” (76 mm) distance to combustibles and keep attic insulation
away from the pipe.
7.
Finally, extend the pellet vent to go through the roof flashing.
8.
Ensure that the rain cap is approximately 36” (900 mm) above the roof.
9.
The same methods apply for vertical installation outside. Install wall thimble and pipe supports.
3 FEET
(92 CM)
Содержание EF-V EVOLUTION
Страница 30: ...30 WIRING DIAGRAM...