background image

Tables

xi

Tables

Table

Page

1-1

GPIM Options ............................................................................................................... 1-4

3-1

Contents of the Module Carton..................................................................................... 3-2

4-1

LANVIEW LEDs............................................................................................................ 4-2

4-2

Troubleshooting Checklist ............................................................................................ 4-4

A-1

Specifications .............................................................................................................. A-1

A-2

COM Port Pin Assignments ......................................................................................... A-2

C-1

GPIM-01 Optical Specifications ................................................................................... C-1

C-2

GPIM-01 Operating Range .......................................................................................... C-2

C-3

GPIM-08 Optical Specifications ................................................................................... C-2

C-4

GPIM-08 Operating Range .......................................................................................... C-2

C-5

GPIM-09 Optical Specifications ................................................................................... C-3

C-6

GPIM-09 Operating Range .......................................................................................... C-3

Содержание SmartSwitch 6G302-06

Страница 1: ...6G302 06 and 6G306 06 Gigabit Ethernet Installation Guide RESET COM CPU 1 2 3 4 5 6 Gb ENET 6G306 06 1 Gb ENET 6G302 06 2 3 4 5 6 RESET COM CPU 9033322 01...

Страница 2: ......

Страница 3: ...OR THE INFORMATION CONTAINED IN THEM EVEN IF ENTERASYS NETWORKS HAS BEEN ADVISED OF KNEW OF OR SHOULD HAVE KNOWN OF THE POSSIBILITY OF SUCH DAMAGES Enterasys Networks Inc 500 Spaulding Turnpike Ports...

Страница 4: ...r modifications made to this device which are not expressly approved by the party responsible for compliance could void the user s authority to operate the equipment INDUSTRY CANADA NOTICE This digita...

Страница 5: ...mittee for Electrotechnical Standardization When operating within their performance limitations laser transceiver output meets the Class 1 accessible emission limit of all three standards Class 1 leve...

Страница 6: ...erce which prohibit export or diversion of certain technical products to certain countries unless a license to export the product is obtained from the U S Government or an exception from obtaining suc...

Страница 7: ...mentation and media ENTERASYS DISCLAIMS ALL WARRANTIES OTHER THAN THOSE SUPPLIED TO YOU BY ENTERASYS IN WRITING EITHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABI...

Страница 8: ...asys Networks Ltd Nexus House Newbury Business Park London Road Newbury Berkshire RG14 2PZ England Conformance to Directive s Product Standards EC Directive 89 336 EEC EC Directive 73 23 EEC EN 55022...

Страница 9: ...Suppression 1 5 1 6 Port VLAN Redirect Functions 1 6 1 7 Traffic Rate Limiting 1 6 1 8 Flow Control 1 7 1 9 GARP Switch Operation 1 7 1 10 802 1 Port Priority 1 7 1 11 Distributed Chassis Management...

Страница 10: ...5 1 Connecting UTP Cables to the 6G302 06 3 13 3 6 Connecting the 6G306 06 to the Network 3 17 3 6 1 SC Fiber Connections to the Network 3 17 3 6 2 GPIM 09 Connection Using Multimode Cable 3 18 3 6 3...

Страница 11: ...abit Ethernet Specifications C 1 C 1 1 GPIM 01 Specifications 1000BASE SX C 1 C 1 2 GPIM 08 Specifications C 2 C 1 3 GPIM 09 Specifications 1000BASE LX C 3 C 2 Physical and Environmental Specification...

Страница 12: ...ing a Twisted Pair Segment to the 6G302 06 3 14 3 9 Four Wire Crossover Cable RJ45 Pinouts for 10 100BASE T 3 15 3 10 Four Wire Straight Through Cable RJ45 Pinouts for 10 100BASE T 3 15 3 11 Eight Wir...

Страница 13: ...2 4 2 Troubleshooting Checklist 4 4 A 1 Specifications A 1 A 2 COM Port Pin Assignments A 2 C 1 GPIM 01 Optical Specifications C 1 C 2 GPIM 01 Operating Range C 2 C 3 GPIM 08 Optical Specifications C...

Страница 14: ......

Страница 15: ...rnet and IEEE 802 3 type data communications networks and their physical layer components is helpful when installing the modules This chapter provides preliminary information to aid in using this manu...

Страница 16: ...s and physical properties Appendix B Mode Switch Bank Settings and Options describes how to set the Mode Switch and install the optional FLASH module upgrade Appendix C GPIM Specifications lists the o...

Страница 17: ...avoid damage to the equipment Electrical Hazard Warning symbol Warns against an action that could result in personal injury or death due to an electrical hazard Warning symbol Warns against an action...

Страница 18: ...taken to resolve the problem e g changing mode switches rebooting the unit etc The serial and revision numbers of all involved Enterasys Networks products in the network A description of your network...

Страница 19: ...switching bridging in the Matrix E7 chassis and is backwards compatible with the 6C105 SmartSwitch 6000 chassis The module ports can be configured to control traffic in several ways including prioriti...

Страница 20: ...06 06 3322 01 01 Transmit TX LED 1 Gb ENET 6G302 06 2 3 4 5 6 RESET COM CPU Six Gigabit Ethernet Ports 1000BASE T Receive RX LED System LED COM Port RESET Button Six Gigabit Ethernet Ports for Optiona...

Страница 21: ...is used for single mode fiber and the GPIM 09 is used for multimode or single mode fiber support See the Release Notes for any changes to this information The module supports the 1000BASE SX and 1000...

Страница 22: ...interfaces have a link If a link is discovered RAD sends out Reverse Address Resolution Protocol RARP and BootP requests to obtain an IP address from a BootP server on the network The RAD requests st...

Страница 23: ...y of the Enterasys Networks switch modules except ATM modules For more information about SmartTrunk and how to configure the SmartSwitch refer to the SmartTrunk User s Guide 1 4 REMOTE MONITORING RMON...

Страница 24: ...ork administrator can configure a rate limit from 100 kbps to 1 Gbps for a given port with an associated list of IEEE 802 1p priorities which can include one some or all of the eight priority levels d...

Страница 25: ...pplications GARP VLAN Registration Protocol GVRP and or GARP Multicast Registration Protocol GMRP GARP is a protocol or set of rules that outlines a mechanism for propagating the port state and or use...

Страница 26: ...nu in Local Management while the module parameters are set by selecting the specific module to be modified and changing the settings for that module 1 12 MANAGEMENT Management of the module can be eit...

Страница 27: ...e Matrix E7 chassis 1 14 STANDARDS COMPATIBILITY The module is fully compliant with the IEEE 802 3z 802 3X 802 1D and 802 1Q standards The module provides IEEE 802 1D Spanning Tree Algorithm STA suppo...

Страница 28: ......

Страница 29: ...rt connections and configurations that must be followed for proper operation Refer to the Matrix E7 Series and SmartSwitch 6000 Series Modules Local Management User s Guide for additional information...

Страница 30: ...r GPIMs may support different types of cabling connections The device at the other end of the fiber connection must meet IEEE 802 3z Gigabit Ethernet requirements for the devices to operate at Gigabit...

Страница 31: ...nto the Matrix E7 Chassis Section 3 3 Installing the Module into the SmartSwitch 6000 6C105 Chassis Section 3 4 Connecting the 6G302 06 to the Network Section 3 5 Connecting the 6G306 06 to the Networ...

Страница 32: ...you install the module before installing GPIMs return to this section to install GPIMs in the module as improper installation can result in damage to either the GPIM or the module There are two diffe...

Страница 33: ...ic discharges Use an antistatic wrist strap and observe all static precautions during this procedure Failure to do so could result in damage to the GPIM or module Always leave the GPIM in the antistat...

Страница 34: ...riented up in relation to the printing on the module See Figure 3 2 to orient the GPIM 20 pin connector Figure 3 2 GPIM Connectors 4 Gently insert the GPIM 20 pin connector side through the GPIM openi...

Страница 35: ...lips 5 Grasp the sides of the GPIM while squeezing the tabs and pull it out of the port 6 If storing or shipping the GPIM insert the dust protector into the GPIM to protect the fiber ports CAUTION Do...

Страница 36: ...itions 5 Lift the GPIM metal locking bar upwards as far as it can go Refer to Figure 3 4 View A 6 Hold the GPIM with the network port facing away from the module The 20 pin connector should be facing...

Страница 37: ...GPIM connector 10 Once the GPIM connector has been firmly seated into the module push down on the GPIM metal locking bar until it clicks into place See Figure 3 4 View B Do NOT force the locking bar i...

Страница 38: ...locking the metal locking bar This can damage the GPIM The GPIM and the module are sensitive to static discharges Use an antistatic wrist strap and observe all static precautions during this procedure...

Страница 39: ...must be reshipped Observe all precautions to prevent damage from Electrostatic Discharge ESD 5 Examine the module for damage If any damage exists DO NOT install the module Immediately contact Enteras...

Страница 40: ...Metal Back Panel Circuit Card Card Guides 50 60Hz 50 60Hz LINE LINE 100 125V 12A 100 125V 12A 200 240V 6A 200 240V 6A AC ON ACON 1 0 POWER POWER F FAN AN 50 60Hz 50 60Hz LINE LINE 100 125V 12A 100 12...

Страница 41: ...e installed in any of the slots that are available To install a module refer to Figure 3 7 and proceed as in Section 3 3 CAUTION Failure to observe static safety precautions could cause damage to the...

Страница 42: ...tion Figure 3 7 Installing the Module in the 6C105 Chassis 4 5 6 7 6C107 1 2 3 Backplane Connector Metal Back Panel Circuit Card Card Guides Slot Number 3322 00 06 SERIES E5 RESET COM 1 2 3 4 5 6 CPU...

Страница 43: ...hat the device connected to the other end of the segment is powered ON 2 Connect the twisted pair segment to the 6G302 06 by inserting the RJ45 connector on the twisted pair segment into the desired R...

Страница 44: ...end of the twisted pair segment is on and properly connected to the segment c Verify that the RJ45 connectors on the twisted pair segment have the proper pinouts and check the cable for continuity Typ...

Страница 45: ...t Through Cable RJ45 Pinouts for 10 100BASE T TX TX RX RX 2 1 3 6 TO Other Device Port TX TX 2 1 3 6 NOTE RX RX and TX TX must share a common color pair TO RJ45 Switch Port 3387_04 RJ45 to RJ45 RX RX...

Страница 46: ...ble RJ45 Pinouts for 10 100 1000BASE T 3322 09 2 1 3 6 4 5 7 8 TX1 TX2 RX4 RX1 TX4 RX3 TX3 RX2 TX2 TX1 RX3 RX2 TX3 RX4 TX4 RX1 2 1 3 6 4 5 7 8 RJ45 Device Port Other Device Port RJ45 to RJ45 Crossover...

Страница 47: ...receive fibers Figure 3 13 Module Fiber Port Designations Different size and wavelength fiber cable is used for different applications The GPIM 08 and the GPIM 09 typically have a blue connector to i...

Страница 48: ...14 Figure 3 14 GPIM 09 Launch Mode Conditioning Cable Connection 2 Once the Launch Mode Conditioning cable is connected to the ends of the multimode fiber cable proceed to Section 3 6 3 to complete th...

Страница 49: ...imode fiber cable refer to Section 3 6 2 before following this procedure WARNING The GPIM 08 and GPIM 09 use Class 1 lasers Do not use optical instruments to view the laser output The use of optical i...

Страница 50: ...d the Transmit LED is not blinking amber perform the following steps until it is ON a Check that the device at the other end of the link has power turned on and is Gigabit Ethernet compatible b Verify...

Страница 51: ...ting Enterasys Networks 3 7 COMPLETING THE INSTALLATION After installing the module and making the connections to the network proceed as follows 1 If the chassis is installed in a rack that has strain...

Страница 52: ......

Страница 53: ...the RESET Button Section 4 3 4 1 USING LANVIEW The modules use Enterasys Networks built in visual diagnostic and status monitoring system called LANVIEW The LANVIEW LEDs Figure 4 1 allow quick observ...

Страница 54: ...LEDs LED Color State Recommended Action CPU Off Power off Ensure chassis has adequate power Red Blinking Hardware failure has occurred Contact Enterasys Networks for technical support Solid Resetting...

Страница 55: ...t Enterasys Networks for assistance TX Transmit Off No activity Ensure that the Spanning Tree Algorithm STA is enabled and that there is a valid link Green Flashing Indicates activity Rate indicates d...

Страница 56: ...ER RETURN may take up to four times Incorrect terminal setup Refer to the Matrix E7 Series and SmartSwitch 6000 Series Modules Local Management User s Guide for proper setup procedures Improper consol...

Страница 57: ...rt is disabled Enable port Refer to the Matrix E7 Series and SmartSwitch 6000 Series Modules Local Management User s Guide for instructions to enable disable ports No link to device 1 Verify that all...

Страница 58: ...tc were lost when the module power was cycled or the front panel RESET button was pressed 1 Position of Mode switch 7 NVRAM Reset was changed sometime before either cycling power or pressing the RESET...

Страница 59: ...the RESET button resets the device and all current switching being performed by the module is halted A module downtime of up to two minutes will result from this action for any devices connected to th...

Страница 60: ......

Страница 61: ...ations for the 6G302 06 and 6G306 06 Table A 1 Specifications Item Specification I O Ports 6G302 06 Ports 1 through 6 Gigabit Ethernet 1000 Mbps 1000BASE T compliant with RJ45 connectors 6G306 06 Port...

Страница 62: ...ht Unit 2 04 kg 4 5 lb MTBF Predicted 179 544 hours Environmental Operating Temperature 5 C to 40 C 41 F to 104 F Storage Temperature 30 C to 73 C 22 F to 164 F Operating Relative Humidity 5 to 90 non...

Страница 63: ...t the following safety and electromagnetic compatibility EMC requirements Safety UL 1950 CSA C22 2 No 950 73 23 EEC EN 60950 IEC 950 and EN 60825 Electromagnetic Compatibility EMC FCC Part 15 CSA C108...

Страница 64: ......

Страница 65: ...Upgrading the FLASH Figure B 3 B 1 REQUIRED TOOLS Use the following tools to perform the procedures provided in this appendix Antistatic wrist strap Phillips screwdriver CAUTION An antistatic wrist st...

Страница 66: ...be changed Switch definitions and positions are as follows Switches 1 through 4 For Enterasys Networks use only Switch 5 COM Port Autobaud The default OFF position enables Autobaud sensing on the COM...

Страница 67: ...in FLASH memory Switch 7 Clear NVRAM Changing the position of this switch resets NVRAM on the next power up of the device All user entered parameters such as the IP address device names etc are reset...

Страница 68: ...The FLASH memory can be expanded from 8 MB to 16 MB This section explains how to locate and add replace the FLASH module For details on getting help refer to Getting Help in About This Guide B 3 1 Lo...

Страница 69: ...shown in Figure B 3 insert the FLASH module down between the connector 2 Pivot the FLASH module downward so the connector clips align with the two side notches of the FLASH module and the connector cl...

Страница 70: ......

Страница 71: ...GPIM 01 supports multimode MMF fiber cable the GPIM 08 supports single mode SMF fiber cable and the GPIM 09 supports both multimode and single mode fiber cable as specified in the following tables C...

Страница 72: ...nge 62 5 m MMF 160 MHz km 2 220 Meters 62 5 m MMF 200 MHz km 2 275 Meters 50 m MMF 400 MHz km 2 500 Meters 50 m MMF 500 MHz km 2 550 Meters Table C 3 GPIM 08 Optical Specifications 10 m SMF Transmit P...

Страница 73: ...itivity 20 dBm 20 dBm 20 dBm Link Power Budget 8 5 dBm 8 5 dBm 10 5 dBm Table C 6 GPIM 09 Operating Range Modal Bandwidth 1300 nm Range 62 5 m MMF 500 MHz km 2 550A Meters A In order to obtain the dis...

Страница 74: ...oz Operating Temperature 5 C to 40 C 41 F to 104 F Storage Temperature 30 C to 90 C 22 F to 194 F Operating Humidity 5 to 90 non condensing The GPIMs meet the following safety and electromagnetic comp...

Страница 75: ...6 06 1 3 introduction to 1 3 D Distributed Chassis Management 1 8 Document conventions xv F FLASH installation B 5 G Getting help xv GPIM options application of 1 4 description of 1 4 different styles...

Страница 76: ...Compliance A 3 C 4 Related manuals xiv Remote Monitoring RMON introduction to 1 5 RESET button 4 7 RJ45 ports connections to 3 13 Runtime IP address discovery introduction to 1 4 S Safety information...

Отзывы: